November 15, 2002 114 Liberty Street REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS

15 REMOVAL OF CONTAMINATED DUST, DEBRIS AND MATERIALS

PART 1 - GENERAL

1.01 RELATED DOCUMENTS:

A. Installation of Critical and Primary Barriers, and Work Area Isolation Procedures are set forth in Section 07 Temporary Enclosures and Work Area Preparation.

B. Project Decontamination procedures are specified in Section 13 Project Decontamination.

PART 2 - PRODUCTS

2.01 MATERIALS AND EQUIPMENT:

A. Provide new or used materials and equipment that are undamaged and in serviceable condition. Provide only materials and equipment that are recognized as being suitable for the intended use, by compliance with appropriate standards.

B. Plastic Bags: Sealable, disposable bags, minimum 6 mil. thick.

C. Waste Container Bag Liners and Flexible-Trailer Trays: One piece leak resistant flexible tray with absorbent pad, as manufactured by Packaging Research and Design Corporation, Madison, WS. 39130 or equal.

D. Tape: Provide tape which is of high quality with an adhesive which is formulated to aggressively stick to sheet polyethylene, as manufactured by Kendall Co., NASHUA Tape Products; or approved equal.

E. Spray Adhesive: Provide spray adhesive in aerosol cans which is specifically formulated to stick tenaciously to sheet polyethylene, as manufactured by 3M: NASHUA Tape Products: or approved or equivalent.

PART 3 - EXECUTION

3.01 DUST AND DEBRIS REMOVAL METHODS: A. Following isolation of the work area, protection and authorization to proceed, the removal of dust, debris, and contaminated materials shall proceed in the bllowing sequence:

1. Remove and clean any non-porous furnishings that are scheduled to be saved (e.g., kitchen cabinets and countertops, bookshelves, etc.);

2. Remove and dispose of all remaining ftjrnishings and appliances;

3. Remove perimeter gypsum board walls, and any insulation behind the walls; 57 © AMBIENT GROUP, INC. - 2002 REMOVAL OF DUST CONTAMINATED DUST, DEBRIS AND MATERIALS

NYC-WTC_000155709

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000155709Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →