NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 26/DEP OEM Reports to Commissioner
Document / 12 pages

FDNY Incident Action Plan, Dec 21 2001

Machine-extracted title · confidence 95%

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

NYC-WTC_000154518–000154529

Folder label: “DEP OEM Reports to Commissioner

Page image
Scanned page image, NYC-WTC_000154520
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document V ■ >

ACCOMPLISHMENTS (Past 24 hours) 1. Recovery operations continue. „ , , 2. Pull down of 6 WTC completed.. Cutting and debris removal continues.

CONTINUING ACTIONS ' . 1. Application of water to South Tower area and where heaf and smoke are escaping in an attempt to extinguish/reduce the heat. Operation continues. 2. Operations continue on debris removal from the North Tower area with inteimittent use of handlines to cool debris. , , 3. Steel cutting @ Bankers Trust (130 Liberty St.), from 11“* floor down to 8*** floor ‘ continues on a 24-hour basis with a shift change between 1700 - 1900 hours. Handline fire prevention/suppression support from FDNY will be necessary on a floor-by-flo6fbasis. This work continues. Sprinkler & Standpipe systems are OOS. 4. Demolition of 6 has been completed. Hand line fire prevention/suppression support from FDNY required on Vesey St. as necessary. 5. NYDOL PESH issuing personal monitoring for Pd & FD. 6. West Street Siamese at 3 WFG is OOS. Use Vesey Street Siamese if needed. 7. Demolition work at 3 WFC.' Burning on floors 1-10 from 1600 to 2400 hrs. FD' support needed fire suppression/fire prevention. Observe exclusion zone. 8. Glass removal from the west and north facade of Bankers Trust along .Washington St. from the 39‘^ floor down, Sunday night and Monday night. 9. PAPD & Mooretrench will enter North & South Projections at 0900 & 1500 hrs. , daily to inspect dewatering pumps in PATH tubes. This will be an ongoing operation. This information will be updated weekly.

PLANNED ACTIONS (Next 24 hours) 1. Demolition work at 3 WFC. Burning on floors 1-10 from 1600 to 2400 hrs. FD support needed fire suppression/fire prevention. Observe exclusion zone. ' ■ 2. Precutting of south bays of WTC 6 completed, pull down should be complete by 12/21/01. FD support required for suppression. _____ ___________ ___________ ANTICIPATED ACTIONS (48 - 72 hours) ~~

12/21/01 FDNY lAP - NOT FOR PUBLIC DISTRIBUTION I 2

NYC-WTC_000154520

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154520Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000154538 · Box DEP Box 26

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

Cited alongside this record in an Ask answer

Compare copies and versions →