NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 26/DEP OEM Reports to Commissioner
Document / 12 pages

FDNY Incident Action Plan, Dec 21 2001

Machine-extracted title · confidence 95%

Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.

NYC-WTC_000154518–000154529

Folder label: “DEP OEM Reports to Commissioner”

Page image
Scanned page image, NYC-WTC_000154520
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document V ■ >

ACCOMPLISHMENTS (Past 24 hours) 1. Recovery operations continue. „ , , 2. Pull down of 6 WTC completed.. Cutting and debris removal continues.

CONTINUING ACTIONS ' . 1. Application of water to South Tower area and where heaf and smoke are escaping in an attempt to extinguish/reduce the heat. Operation continues. 2. Operations continue on debris removal from the North Tower area with inteimittent use of handlines to cool debris. , , 3. Steel cutting @ Bankers Trust (130 Liberty St.), from 11“* floor down to 8*** floor ‘ continues on a 24-hour basis with a shift change between 1700 - 1900 hours. Handline fire prevention/suppression support from FDNY will be necessary on a floor-by-flo6fbasis. This work continues. Sprinkler & Standpipe systems are OOS. 4. Demolition of 6 has been completed. Hand line fire prevention/suppression support from FDNY required on Vesey St. as necessary. 5. NYDOL PESH issuing personal monitoring for Pd & FD. 6. West Street Siamese at 3 WFG is OOS. Use Vesey Street Siamese if needed. 7. Demolition work at 3 WFC.' Burning on floors 1-10 from 1600 to 2400 hrs. FD' support needed fire suppression/fire prevention. Observe exclusion zone. 8. Glass removal from the west and north facade of Bankers Trust along .Washington St. from the 39‘^ floor down, Sunday night and Monday night. 9. PAPD & Mooretrench will enter North & South Projections at 0900 & 1500 hrs. , daily to inspect dewatering pumps in PATH tubes. This will be an ongoing operation. This information will be updated weekly.

PLANNED ACTIONS (Next 24 hours) 1. Demolition work at 3 WFC. Burning on floors 1-10 from 1600 to 2400 hrs. FD support needed fire suppression/fire prevention. Observe exclusion zone. ' ■ 2. Precutting of south bays of WTC 6 completed, pull down should be complete by 12/21/01. FD support required for suppression. _____ ___________ ___________ ANTICIPATED ACTIONS (48 - 72 hours) ~~

12/21/01 FDNY lAP - NOT FOR PUBLIC DISTRIBUTION I 2

NYC-WTC_000154520

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154520Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

WTC Daily Report Memo, Oct 16 2001 · Box DEP Box 26

NYC-WTC_000154452

Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.

12 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000154536 · Box DEP Box 26

Summary of issues discussed at a joint FDNY and DEP meeting regarding WTC site operations on December 21, 2001.

Cited alongside this record in an Ask answer

Compare copies and versions →