Daily report on WTC construction coordination meeting, Sept 2001

Machine-extracted title · confidence 95%

Daily activity report noting a scheduled construction coordination meeting and updates regarding reservoirs and health safety at the World Trade Center site.

NYC-WTC_000154433–000154434

Folder label: “DEP OEM Reports to Commissioner

Page image
Scanned page image, NYC-WTC_000154433
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document V 1 Fox: Rug •2-2tXX) 00:32 P. 01 J

s

TO: Commissioner Miele 718-S35-2709 CC; First Deputy Commissioner Chapin 7 i 8’595-3557 Deputy Commissioner Avahroni 718’595-4544 , Deputy Commissioner Greeley 718-595-5342 FROM: ‘ Paul Bennett RE: Daily Report for 9/28/01 -677^ DATE: Sept 28. 2001 via FAX

Summary' of daily activities for 9/28/01.

Construction Coordination Meeting

OEM/'FDNY/DDC to host a construction coordinaLiort meeting tomorrow at the Fire House on .Duane St between Church and Broadway at 7:00 AM. DEP was requested to have senior level people attend. Jack Vokral, Moustafa Fawzy(?), and Paul Bennet! to attend.

Jersey Barriers for Hillview & Jerome Park Reservoirs

■ Tony Cosentino arranged for 280 feet of Jersey Barrier. Doug Greeley to arrange for transport and placement.

Ilealtb and Safety meeting

Freon chiller recon - Update: FDNY awaiting design drawings from manufacturer before proceeding. Di’awings ex.p'ected to be awailabie on Monday. EPA pre.sented results of analysis of a water sample collected from a stairwell. The location and date sample was collected in not clear. Freon was detected in the rvater at a concentration of about 400 pph (Concentration to be confirmed). Complete list of results will be provided to DEP.

'■ FDNY requested DEP-HazMai to attend a .SJonday morning (9 AM or 11 AM - TBD) to discu-ss recon mission. Tliis meeting will be held at the Fire House on Duane St also.

Storm Water PoUution Prevention Plan under development.

EPA is in the process of developing a storm water pollution preventiou plan. EPA asked DEP for a contact within the agency to assi.st in the development of the policy.

To whom should 1 direct this request? Contact, person at EP^^. is Tim Dowd 301-908-2S69.

FDNY to apply PyroCool to the fire tomorrow. PyroCool is designed for fighting deep seated fires.

1

V NYC-WTC_000154433

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154433Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000154424 · Box DEP Box 26

Daily activity report detailing updated identification requirements for DEP employees and contractors entering the Red Zone at the World Trade Center site.

Filed in the same folder

Compare copies and versions →