NYC 9/11 Public Portal Document
The Senate's cloakrooms and press gallery were reopening Wednesday, a day after they had
been shut down because asbestos was detected in the adjacent Senate chamber. ...
A piece of the fiber was discovered in the chamber's ventilation system Sunday night as work
on an asbestos abatement project was ending, said Eva Malecki, spokeswoman for the
Capitol architect's office.
Tests in the chamber found readings as high as 99 structures per square millimeter. Federal
law considers anything above 70 to be a problem. A structure is an asbestos particle or piece
of a particle. Officials realized Tuesday that similar problems might exist in the cloakrooms
and press gallery because they share some auxiliary ducts with the chamber, Malecki said.
Reporters and press gallery staff were told to leave the gallery at about 1 p.m. EDT. ...
The response to the Senate contamination problem was appropriate and within guidelines and
regulatory standards set by EPA. The response to the WTC collapse was not. Furthermore,
citizens were being exposed to many other contaminants in addition to asbestos after 9/11,
which should have caused even greater concern.
EPA presumption: asbestos hazard from implosions/fires
Regardless of whether or not EPA had data showing hazardous levels of asbestos at the time
of their early statements, there is an established EPA presumption there will be hazardous
levels if a building implodes with an ensuing fire.
EPA has regulatory guidance under the Clean Air Act asbestos standards (National Emission
Standards for Hazardous Air Pollutants) which requires removal of all asbestos from a
building if it is going to be demolished by an implosion with the subsequent possibility of a
fire.
To the point, EPA states that if the military is going to use a building for target practice, and
a fire may result, then asbestos materials must be removed first?’
EXPLOSIONS/IMPLOSIONS Building implosions utilizing explosive devices constitute a
rarely-used demolition technique. In simplest form, this method is accomplished through the
use of explosive charges placed strategically throughout a building so that the building
collapses in on itself and debris does not radiate outward to any appreciable distance.
Relatively large quantities of dust are created, however, and the direction and magnitude of
transport are matters of concern. ...
The destruction of buildings during military target practice is considered to be another form of
explosive demolition. Category I materials may remain in place during target practice.
However, if it can be expected that the building and ACM will burn as a result of explosive
demolition, the ACM must be removed prior to demolition.
Thus, EPA did not need any testing to know that there would be an asbestos hazard in lower
Manhattan after 9/11. In the absence of data or even if there was limited non-statistical data,
EPA should have evacuated the areas impacted by the WTC dust cloud and plume.
13
NYC-WTC_000153792
OCR can misread numbers and units. Confirm readings against the page image before using them.