8 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗Asbestos project monitor and air sampling contract terms, no date
Machine-extracted title · confidence 100%Detailed contract terms specifying regulatory compliance and certification requirements for monitors and technicians at the World Trade Center site.
NYC-WTC_000151288–000151294Folder label: “CONTRACTS CONTRACTORS - See: $ matrics etc file”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Removal Branch comments on the draft NYC Scope of Work (SOW) document for the asbestos project monitor and air sampling contract. These comments mostly pertain to the process that is being proposed for the asbestos cleanups. Comments on the clean up process are included separately:
Backround:
- My understanding is that NYC will be executing contracts with asbestos cleanup contractors to perform the cleanups and with A/E firms to schedule and monitor the cleanups and to conduct asbestos sampling after the cleanups are complete. The SOW states that there are three classes of worker in the A/E contract, (1) Technicians to conduct the air monitoring, (2) Project Monitors to schedule the cleanups (based on the requests received by the hotline), to perform final inspections then sign a project completion report and to ensure that the clean up activities comply with the scope of work and a (3) Project Manager (not listed in the Qualifications section but mentioned in the Post Cleaning Air Sampling Proceedures section, item e)) who will advise the occupants about the advantages and disadvantages of conducting aggressive air monitoring. The process, in summary, requires the monitor to schedule the cleanup, to ensure that the cleanup complies with attached Scope of Work (the document doesn’t say how), to schedule the Technicians to perform sampling and to conduct the final inspection.
- The EPA role that is explained in the NYC SOW includes maintaining the hotline and providing appropriate procedures for cleaning up building apartments where there are large debris accumulations. An EPA coordinator provides the appropriate procedures for cleaning up apartments with large debris.
My concerns are as follows:
1) The NYC SOW does not include any provisions for EPA monitoring the work activities, assuming that EPA wants to provide such monitoring. My understanding is that NYC will execute contracts with cleanup contractors to provide the cleanups (in accordance with the attached Scope of Work) and with A/E firms to monitor the cleanup contractors and to do the asbestos sampling. The contracts will be controlled by NYC Contracting Officers and Project Officers (or whatever they call them), who will be responsible for determining if the work performed meets the contractual requirements and if payments should be made. They will also make judgements (presumably based upon the representations of the Project Monitors) of any failure to perform and the associated corrective actions. Although we have not seen the contract documents, the SOW clearly places responsibility for the determination of proper performance in the hands of the Project Monitors.
- If EPA wants to assume an oversight role that is in any way similar to the role that is performed in the monitoring of our own cleanup contractors, we would have to change the NYC Scope of Work to assign compliance assurance responsibilities to EPA employees rather than the Project Monitors (the contract dociunents would also have to be changed accordingly to empower the EPA people with the necessary authorities, such as the Contracting Officer authorities that are given to OSCs through their OSC Warrants e.g. to stop work, to approve invoices etc.).
NYC-WTC_000151291
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000138626
Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
9 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163864
EPA transmits revised statements of work for WTC cleaning and monitoring activities incorporating modifications and additions discussed in interagency meeting.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161167
Forwarded draft Statements of Work for cleaning and monitoring activities requiring review by noon.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138725
EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138674
Distribution of updated statement of work documents for WTC cleaning and monitoring programs.
9 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138585
Distribution of updated statement of work documents for WTC cleaning and monitoring programs.
9 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139539
Updated scopes of work for WTC cleaning and monitoring contracts distributed to multiple agencies for coordination.
9 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
6 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162352
EPA request for review and feedback on draft scope of work documents for WTC cleaning and air monitoring contractors.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
A notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of due to potential legal actions.
Filed in the same folder
Report establishing health-based screening levels for the indoor environment with cross-agency representation.
Filed in the same folder
Letter confirming contractor responsibility for cleaning residences and HVAC systems in accordance with project scope.
Filed in the same folder
Confidential cover sheet from the U.S. Environmental Protection Agency regarding a specific confirmation item.
Filed in the same folder
NYC-WTC_000151148
EPA coordination memo regarding identification and contact of eligible apartment requests for WTC testing and cleaning.
Filed in the same folder