\2r-2b-/.J/l 12=55 f-lAV2P?’3 CrC Or L ,J. r' .AL 99e 7324 P.03/03
MxtM
* Cleaned'areas.
8. Isolation barriehs shall be installed between nnafl'ecCeri areas and areas to be cleaned.
9. A thud party, who is independent of the asbestos ebaiement contractor, must perfonn air sampling
and analysis. Any person(s) who conducts sampling must possess a valid NYS Asbestos Project Air
Sampling Tedmician Certificate. .Air sampiinjt must be performed in accordance with the
requirements set forth in Title 15, Chapter 1 .off'..'ri Rui as of the-City df.New York.
10. An “Asbestos Inspection Report” form, ACP 7,^shaH be submitted directly to the DEP within one-
week. The AC? 7 iTnist list the emergency eie<in up nuanndes in item 30.
II. Please .uote, the disturbance^' removal of in place material in the work place is not permitted dming
clean-up activities unless the Department specifically determines the need to abate damaged in place
as part of the clean up. The emergency phase of the project mu-tt be completed prior to in place ACM
abatement.
If you have any questions or require clarification, please do not hesitate to cal! the Department at (718)<
DEP -HELP (24 hr&/7days).
TOTAL P.03