NYC 9/11 Public Portal Document
115 Broadway, Manhattan
ACP7 received 11/19/2001 for the clean-up of 7,000 square feet of office space on the 3"* floor
Scope of work received 10/29/2001
ACP7 received 10/15/2001 for the clean-up of 386,000 square feet, floors 1-21, lobby and basement
Air samples analyzed by NIOSH 7400 method
9/28/2001 12 samples: <0.01 flee
9/27/2001 18 samples: <-0.01flcc
217 Broadway, Manhattan
ACP7 received 9/28/01 for the clean-up of20,000 square feet of roof (Scope of work had been
submitted on 9/20/01)
225 Broadway, Manhattan
5 PCM samples (lobby east, lobby west, 17*, 22"**, and 23"* floor): <0.01 flee
2 Dust Samples: No asbestos detected
2 Wipe Samples: No asbestos detected
233 Broadway, Manhattan
6 AHERA Samples (lobby, 5*, 12*, 16*, and 29* floor): No asbestos structures detected.
345 Chambers Street, Manhattan
Stuyvesant High School
Extensive sampling performed, data available from BOE
Air Sampling Reports by ATC Environmental
Air Sampling Reports by Taylor Environmental
Floor Plans
Clean-up in two phases: Phase I Floors 6-11, Phase II Floors 1-5 (50,000 square feet)
90 Church Street, Manhattan
US. Post Office
ACP7 received 12/14/2001 for the clean-up of 7,000 square feet on the 7* floor, SW storage area.
2
NYC-WTC_000149474
OCR can misread numbers and units. Confirm readings against the page image before using them.