NYC 9/11 Public Portal Document
, ae
Sep-22-01 01:22pm = From= T-706 P.02/02 F345
—_————-
1 bi Access:
Building owner with f of ownership of building or right to occupy same (e.g. deed, ground lease) or
Tuilding manager with management agent registration ur other proof uf auburfy to act on ihe owner's
behalf must meet with commacer POR RS nS emerson
Owner, manager and contattor must alo have photo t on. All must spcak to D
laspector in charge, present personal ID and building credenrials, Owner or managing agent will be
required to sign 2 police release form issued by N'YPD whereby owner assumes liability for the building, is
eoidents aud occupauts Upon NYPD satisfaction of prouf«Cownenhip/management authority und al)
photo 1D, NYPD may, mm its sole discretion, make arrangements with the owner and contactor and NYPD
to establish a checkpoint and time tor access for contractor and &s crew.
Work Crew Access Procedune:
‘She cantractar 3 responsible tor gasemblng the entire work crew at the established eheckpoinr ar thc
appointed time.
. Each wow wewiber must lave ils owe photo ID, sud ID establishing ies eouphsyment by dre conracnor
Uncluding sacial sceurity number),
Once NYPD has inspected and approved all LD, NYPD will escort the contractor aad the enhre crew fo the
building.
This Work Crow Acscss Procedure will be repeared cach day aceess ix required.
The cautrator is responsible fur assembling nll vebicles requising access for die workday mu Sawh and Pike
Sovcts. Cenrrector’s crew chicf will then go to the access van at Broadway and Fulson Srrects and notify
The NYPD wspector m charge that al) velucles mre ready ond wasting at South Sirevt.
‘The crew chief will hen ride with NYPD 1o South und Pike Sirecty where nll vehicles will be inspeced and
al! personnel ID will be checked. Upan NYPD's sarisfactavy inspection aud spmovel of alt vehicles aud
personnel, NYPD will escort the contractor's vehicles to a checkpoint at the of the restricted arca.
Asy orher personnes! joining the crew at that time Will have to present proper 112 at that pomt. Contractor
may be required to undergo rrother overall vebicle and ID check at that time. Once NYPD is satisfied and
clears the vehicles and persopr ‘| for admission into the resrricted urea, NYPD will escon the conrmucior
vehicle(s) ty the worksite. This procedure aut be followed cach nud every time the comtractar requires
vehicular ececss to the site.
CONTRAC ORS MUST HAVE SUCCESSFULLY COMPLETED NYML'S INILIAL PROCEDURE
TO OBTAIN ACCESS BEFORE WORK CREW AND VEHICLE aCCESS WILL BE PERMITTED!
Gloalor
NYC-WTC_000149327
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000149327Source: NYC Law Department, mirrored locally
Joint announcement of a comprehensive plan by the EPA and city partners to address indoor air quality concerns in residential units south of Canal Street.