NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
WHS Heat Stress Management Standard Operating Procedure
1.0 PURPOSE
The Heat Stress Management SOP is intended to describe measures which will reduce the probability of workers experiencing a heat related disorder.
2.0 SCOPE
The Heat Stress Management SOP is applicable to all WRS project sites. Its implementation is mandatory when workers wearing impermeable personal protective equipment are exposed to ambient air temperatures above 70°F.
3.0 DEFINITIONS
Stress can contribute significantly to accidents or harm workers in other ways.
The term "stress" denotes the physical (gravity, mechanical force, heat, cold, pathogens, injury) and psychological (fear, anxiety, crises, joy) forces that are experienced by individuals.
They body’s response to stress occurs in three stages:
a. Alarm Reaction - The body recognizes the stress and the pituitary-adreno-cortical system responds by increasing the heart rate and blood sugar level, decreasing digestive activity and dilating the pupils.
b. Adaptive Stage - The body repairs the effect of stimulation and stress symptoms disappear.
c. Exhaustion Stage - The body can no longer adapt to stress and the individual may develop emotional disturbances and cardiovascular and renal diseases.
The most common types of stress that affect remediation persoimel are heat stress and cold stress. Heat and cold stress can be the most serious hazards an employee encounters at hazardous waste sites.
Heat Stress usually is a result of protective clothing decreasing natural body ventilation, although it may occur at any time work is being performed at elevated temperatures.
If the body’s physiological processes fail to maintain a normal body temperature because of excessive heat, a number of physical reactions can occur ranging from mild (such as fatigue, irritability, anxiety, and decreased concentration, dexterity, or movement) to fatal. Because heat stress is one of the most common and potentially serious illnesses at hazardous waste sites, regular monitoring and other preventative measures are vital.
Site workers must learn to recognize and treat various forms of heat stress.
4.0 RESPONSroiLITIES
The Project Manager/ Supervisor is responsible for directing work in accordance with this procedure when implementation conditions are met. The PM is also responsible for providing resources necessary for implementation of the procedure.
The Site Health and Safety Officer is responsible for monitoring and facilitating employee compliance with the procedure. The SHSO is responsible for instructing employees in the recognition and control of heat related illnessess.
5.0 PROCEDURE
WKS Infrastructure & Environment, Inc
NYC-WTC_000145117
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer