Difficult Areas Encountered:
• Ceiling void space was cluttered with utilities.
• The wood structural members above the void space were porous and flaking.
• Minimal space was available in the void space making it difficult to work.
• Hydronic baseboard heating units were difficult to clean using vacuum equipment only.
• Wall-to-wall carpeting was difficult to clean thoroughly.
• Frequent clogging of vacuum filtration systems occurred due to the quantity of dust.
18
NYC-WTC_000145194
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000145194Source: NYC Law Department, mirrored locally
Document excerpt acknowledging contributors and outlining the collaborative scope of an EPA environmental protection study regarding the World Trade Center site.
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.