NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
1. Health and Safety Issues
1.1 Electrical Concerns
All areas of the building were inspected to ensure that no electrical concerns posed a threat to the safety of employees. In the Food Exchange, live, loose hanging electrical wires were foimd. Electricity at the panel box was shut off and the wires in question were taped.
1.2 Building Repairs
A damaged hand rail in the Liberty Street stairwell was reinstalled to ensure the safety of personnel. All other repairs made prior to commencement of the work related to building access.
13 Building Access
The only access concern related to broken windows in the Chiropractor’s Office, In order to prevent unauthorized access, which could potentially pose risks to both public health and to equipment used in the study, plywood panels were installed over the broken windows.
1.4 Rodent Infestation
In the process of inspecting to identify safety concerns, evidence of rodent infestation was discovered (droppings). The building owner was advised of the problem and contacted an exterminator.
1.5 Personal Monitoring
Every morning, the Site Health and Safety Officer calibrated the personal pumps. The initial flow, pxnnp start time, pump serial number, date, location of pump, and sample number were recorded. Personal pumps are typically worn by employees to collect air samples that are representative of what die employees are experiencing while working. Given the space constraints of the work areas and the number of parameters to be measured, the majority of exposure measurements were made using area samples.
Pumps for the three parameters were mounted on five-foot tripod stands, in lieu of being worn by the employees. The Site Health and Safety officer collected media blanks at a rate of 10% of samples. At the raid of the day, the stand was disassembled and the final flow rate and finish time were recorded. The total volume was calculated and the samples were packaged and forwarded to EPA’s contracted laboratoiy. The laboratory is accredited for analysis of lead and silica by the American Industrial Hygiene Association and by the NVLAP for asbestos. The air samples were analyzed by the laboratory for asbestos, using one or both of the following procedures: PCM /TEM,
Sampling for airborne lead ceased on July 24,2002, after consistent results of non-detectable concentrations. Sampling for asbestos and silica continued throughout the project to the extent commensurate with the task and crew size.
1
NYC-WTC_000145158
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer