Scope of Work B for visible WTC debris cleanup procedures,

Machine-extracted title · confidence 100%

Procedural document outlining requirements for cleaning visible debris accumulations and project notifications.

NYC-WTC_000140591–000140592

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140591
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Indoor Clean-up Activities

Scope of Work B

Application: A visual inspection was performed and visible accumulations of debris from the collapse of the WTC was identified. The USEPA coordinator must be contacted immediately with information regarding the presence of debris. The contractor shall not proceed with work until the USEPA coordinator provides a determination regarding appropriate procedures. This scope of work consists of generic procedures to be followed. Clean-up of visible acciunulations of debris will require the submittal of a site specific scope of work. If debris is not present, refer to Scope of Work A.

1. All work shall be performed by a NYSDOL licensed contractor with NYSDOL- and NYCDEP- certified workers.

2. An ACP-7 form asbestos project notification form shall be submitted directly to the NYCDEP Asbestos Control Program prior to the start of work. NYSDOL notification shall be submitted.

3. A third party air monitoring firm shall perform air sampling. The person who conducts sampling shall possess a valid NYSDOL certificate.

4. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 14, Chapter 1 RCNY as the work area and the decontamination enclosure system).

5. Personal protective equipment including disposable clothing, gloves, and respirators in accordance with OSHA rules and regulations.

6. Warning signs shall be posted at the approach to the work area.

7. A worker decontamination enclosure system shall be installed at the entrance to the work area. A remote decontamination enclosure system shall be considered when appropriate i.e. inability to comply with the provision due to space limitation or other agency rules, such as for compliance with NYCFD egress requirements.

8. HVAC systems shall be shut down and locked out or isolated locally.

9. Isolation barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed with tape.

10. Negative pressure ventilation equipment shall be installed for and operated during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 30 minutes shall be provided. When ducting to the

NYC-WTC_000140591

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140591Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →