Indoor Clean-up Activities
Scope of Works
Application; A visual inspection was performed-and visible accumulations of debris from ths
collapse of the WTC waa identified. The USEPA coordinator must be contacted i IltHVsdiately
with information regarding the presence of debris. The contractor shall not proceed with work
until the USEPA Coordinator provides a determination regarding appropriate procedures, This
scope of work consists of generic procedures to be followed. Clean-up of visible accumulations
of debris will require the submittal of a Site Specific scope of work. If debris is not present, refer
to Scope of Work A.
1. All work shall be performed by a NYSDOL licensed contractor with NYSDOL- and
NYC DEP- certified workers.
2. An ACP-7 form asbestos project notification form shall be submitted directly to the
NYCDEP Asbestos Control Program prior to the start of work. NYS DOL notification
shall be submitted,
3. A third party air monitoring firm shall perform air sampling. The person who conducts
sampling shall possess a valid NYS DOL certificate. These results shall be sent
immediately to OSHA, the employer and made available to the employees or their
designated representatives for their review in accordance with 29CFR191Q.1020.
- 4, At least one asbestos supervisor shall be present at each work place (work place is
defined in Title 14, Chapter 1 RCNY as the work area and the decontamination enclosure
system).
S. Personal protective equipment including disposable clothing, gloves, and respirators shall
be worn during this clean-up activity in accordance with OSHA rules and regulations.
6. Warning signs shall be posted at the approach to the work area.
7. A worker decontamination enclosure system shall be installed at the entrance to the work
area. A remote decontamination , enclosure system shall be considered when appropriate
i.e. inability to comply with die provision due to space limitation or other agency rules,
such as for compliance with NYCFD egress requirements.
8. HVAC systems shall be shut down and locked out or isolated locally.
9. Isolation barriers shall be installed with two layers of 6-mil polyethylene sheeting and
sealed with tape.
Prepared by: NYC DEP DRAFT
NYC-WTC_000140969
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000140969Source: NYC Law Department, mirrored locally
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Draft scope of work document outlining regulations and procedures for residential dust cleanup and air sampling following the World Trade Center collapse.