← Document results/DEP Box 05/EPA HVAC ACTION PLAN (Indoor Clean up)
Document / 6 pages

Proposal for toilet and exhaust system cleaning at 225 [name]

Machine-extracted title · confidence 100%

Letter from TechClean Industries proposing cleaning services for ventilation systems at a specific residential address.

NYC-WTC_000139983–000139988

Folder label: “EPA HVAC ACTION PLAN (Indoor Clean up)

Page image
Scanned page image, NYC-WTC_000139987
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

X 11/NOV.22.200^4 1:54PM 6312123191200 ’ TECH CUBAN N0.49g p.6/7 0012

Inbooi Aim Qu an it I Meckahich Hygiene . ! Mr, Peter Boyle Novembe 27,2001 Page 5 of 5 SCOPE OF WORK *1.' A1 grilles and dift'users, either internal to apartments or in common areas, will be treated as fo Hows: k I a- The grille vnll be remoMed and bagged. b. Bach grille will be water and detergent washed. c. Bach grille will be sanitized with an anti-microbial agent. d, The grille vdll be rc-jnsta1|ed. e. Access to each ajjartment hvill be required three (3) times on the day of the cleaning. 1. Tb<; grUlo win be removed and the ductwork will be sealed. 2. The horvwntal ductwork will be Cleaned. 3. The grills will be re-installed and housekeeping will be done. 2. Ti e kitehen and exhaust ductwork «d!l be addre ssed as follows,-

a. The horizontal di'.ctwork will be cleared using a pneujnatic-powerod whip. b. The horizontal dvotwork will be HEPA vacuumed. c. The vcrrica riser»will be cleaned with a pnesunatic whip or rotating brush depending on the internal size. * d. Any debris will be txapped in a HEPA-filtered ccllocdon device. 8, The exhaust' fans will tw disassembled, MEFA-vacuuxned and re-assembled. f. All internal surfaces, frop: terminal ends of horizontal to the rooftop fan, will be treated withan an airless sp^^er han^wping method. ’tLa.sh'IA '

3. Tile air-handling sy items and associated duettvork will be aobressed as follows:

a. The HVAC system will be sequentially addressed tn the direction of die aiiflow, b. The return ductwork grlll^ will be ch^sncd as discussed in Section 1. c. The horizontal dictwork wll be cleaned using a pneumatic whip. Any debris will b9 collected in a HEPA-filter^ collection unit e. If internal crass section of the ductwork is larger than 24 Inches by 24 inches, a technician will ei ter it ^d will contact-clean with a HEPA vacuum. f. The outside air intake louvers w !l be pressure-washed or HEPA-vacuumed, as applicable. i g< All internal surfaces of the air-hardling unit will be HEPA vacuumed to 99.97% efiRciency at .3 microns..,. h. The coils will be high-pre4sure water-washed or HEPA vacuumed, as applicable. i. The supply duev/ ork will be cleaned using the same protocols described above. j- All internal surfixes of the air delivery system will be treated with an anti-microbial agent via an. airie» sprayer or hand-wiping method.

t 1

.V

i NYC-WTC_000139987

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139987Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →