iNBOO* Al* QUAiin t MiCHOfcii Hriiim .
Mr. Peter Hoyle
Novetnbe •27,2001
Page 2 of 6
Equioraet t and Material Sp scific Ttions
1 TechClean shall supply all equipment and materials necessary for the cleaning of the
toilet and genera exhaust syetems and the aiT^handling systems at 225 Rector Street. All
chemicals utiUzai in this process shall have the MSDS submitted to Related Management
for approval befcre usage.
2. X>ebrls coUiiction equipment shall be ixirtable in size to enter the occupied space.
3. Electrical requinjments. will be cooniinated throug^i Related Management. TechClean
will supply a 22>volt pigtail that will be installed by Related Management's in-house
electrician. '
4. Collectors thall be fen .powered high efficiency, dust and particle ooliectton systems.
> • They shall be HEPA filtered, 99.97% efficient at .3 microns at 12,000 cubic ft. per
minute. ‘i
5, TechClean shall take all necessary pmeeutions to prevent dirt and debris from entering
die condhicned s*-3C8. ' *
The collection systems shall be self-conuined to adequately capture dirt and debris
loosened from th i upstream ducts, mt ins and branches during the cleaning process.
sot
1. Ductwork shall I e cleaned, coated, tad sanitized by inserting an air pow'ered extended
whip section, air powered oscillating brushes and electric robotic air powered brushing
systems.
2. Utilized equipment shall be the best to contact clean all surfaces of the air duct regardless
of shape and size. ,
3. Cleaning tciols S3ch as skipper belli or air sweeps will not be used because of ttieir
inability to contest clean all sides of the duct ;
4. Where the ductwork is l^ge enough and able to support the weight of a technician hand
tools and HEPA ’'acuum 99.97% eSitient at J microns shall be used.
5. Technician;; entering the inside of the ductwork and air handling units will follow OSHA
Confined Space Requirements OSTIA 29 CFR 1910 1.46 and OSHA Respiratory
Protection lYogram OSHaCFR 1926.5S Appendix C.
An air compressor shall be used. Electrical requirement shall be eoordinated through
Related Maasger lent. Compressor shall be capable of 180 PST at 25 CFM.
7, All access installed in the ductwork iihall be SMACNA style cam lock insulated access
doors. No patches wii! be lised.
»
< I
1
t
J
NYC-WTC_000139881
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000139881Source: NYC Law Department, mirrored locally
Document page containing identification numbers and tracking codes for environmental samples collected from the World Trade Center site at 69 Murray Street.
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
EPA transmits revised statements of work for WTC cleaning and monitoring activities incorporating modifications and additions discussed in interagency meeting.
Internal memo expressing concerns about advising residents of potential health risks from 15 months of unrealistic HVAC assessment and cleanup, requesting urgent decision-making.
Memo requesting EPA ensure factual information about HVAC matters be prepared for presentation at meeting with City officials, FEMA, and public communications consultant.