NYC 9/11 Public Portal Document
2. The authority to stop work for non-compliance with the Scope of Work.
3. The authority to give technical direction to the contractor in the performance of the work.
4. The authority to review and approve or disapprove of the qualifications of the cleaning
personnel involved in the work.
5. The right to inspect and accept or reject any work .
C» Qualifications §1
Illi
Proof of qualifications must be presented upon request, ii iing qui as for wipe sampling.
personal monitoring and HVAC evaluations.
11 J
Project Monitors
The Project Monitors must possess valid NYS Asbestos 5 "Pt Monitor certificates. The Project
Monitors must have served as a third party project monit -i at least 20 asbestos abatement
projects. Project Monitor must have performed final cW •ance ri—5Q asbestos
.. J
abatement projects. The Project Monitor must hay^j^g^ ss to t! fences to schedule
pre-cleaning unit inspections with residents.
i
Air Monitoring Technicians
Air monitoring technicians must possess valid NY^^lsbestos Prqj_____ _
Sampling Technician (APST)
certificates. Technicians must have p^Ormed aid sampling for at least 6 months.
HVAC System Inspectors r
HVAC assessments and deal IS inspections shall he conducted by qualified personnel. At a
minium sug ^^sonnel sb< an understanding of HVAC system operation and experience in
utilizinglU epted indo^ imental sampling practices, current industry HVAC cleaning
procedure! sad applicable iBandards.
. . ............. b
Background I
All contractor's and subcc Biprs inVblved in the monitoring activities at residential buildings under
this CQp|ldct are resp^ J fear completing a background check on their employees prior to
empll^ees beginning on-^ vork and for screening unacceptable candidates from the pool ofon-site
workers. Contractors are required to maintain records ofbackground checks for 4 years and to make
them available to the ^Jp and EPA when requested. At a minimum, the background check must
1. Law enforcement checks (5 years)
" .. lonal license and certification
D. Specifications
This contract between DEP and the monitoring contractor shall be in force for 24 consecutive
months from the commencement date. The monitoring contractor must be prepared to mobilize within
2
NYC-WTC_000139832
OCR can misread numbers and units. Confirm readings against the page image before using them.