NYC 9/11 Public Portal Document
Environmental Protection Agency Pt. 763. Subpt. E. App. C
(h) Inspectii^ for Mable and non-frlable (1) Regulatory review. The following topics
ACM and assessing the condition of friable should be covered: National Emission Stand
ACM. Procedures to follow in conducting vis ards for Hazardous Air Pollutants (NESHAP:
ual inspections for friable and non-frlable 40 CFR part 61, Subparts A and M): EPA
ACM: types of building materials that may Worker Protection Rule (40 CFR part 763,
contain asbestos: touching materials to de Subpart G): OSHA Asbestos Construction
termine friability: open return air plenums Standard (29 CFR 1926.58): OSHA respirator
and their importance in HVAC systems: as requirements (29 CFR 1910.134): the Asbestos-
sessing damage, significant damage, poten Contalning Materials in School Rule (40 CFR
tial damage, and potential significant dam part 763, Subpart E: applicable State and
age: amount of suspected ACM, both In total local regulations, and differences between
quantity and as a percentage of the total Federal and State requirements where they
area: type of damage: accessibility: mate apply, and the effects, if any, on public and
rial’s potential for disturbance: known or nonpublic schools or commercial or public
suspected causes of damage or significant buildings.
damage: and deterioration as assessment fac (m) Field trip. This Includes a field exer
tors. cise. including a walk-through inspection:
(1) Bulk sampilngfdocunientation of asbestos. on-slte discussion about Infonmatlon gath
Detailed discussion of the "Simplified Sam ering and the determination of sampling lo
pling Scheme for Friable Surfacing Mate cations: on-slte practice in physical assess
rials (EPA 560/5-85-030a October 1985)": tech ment: classroom discussion of field exercise.
niques to ensure sampling in a randomly dis (n) Course review. A review of key aspects
tributed manner for other than friable sur of the training course.
facing materials: sampling of non-friable ma
terials: techniques for bulk sampling: Inspec 4. Management Planner
tor’s sampling and repair equipment:
patching or repair of damage from sampling: All persons who prepare management plans
discussion of polarized light microscopy: for schools must be accredited. All persons
choosing an accredited laboratory to analyze seeking accreditation as management plan
bulk samples: quality control and quality as ners shall complete a 3-day Inspector train
surance procedures, EPA’s recommendation ing course as outlined above and a 2-day
that all bulk samples collected from school management planner training course. Pos
or public and commercial buildings be ana session of current and valid inspector accred
lyzed by a laboratory accredited under the itation shall be a prerequisite for admission
NVLAP administered by NIST. to the management planner training course.
(j) Inspector respiratory protection and per The management planner course shall in
sonal protective equipment. Classes and char clude lectures, demonstrations, course re
acteristics of respirator types: limitations of view. and a written examination.
respirators: proper selection. Inspection: EPA recommends the use of audiovisual
donning, use, maintenance, and storage pro materials to complement lectures, where ap
cedures for respirators: methods for field propriate.
testing of the facepiece-to-face seal (positive TSCA Title II does not require accredita
and negative-pressure fit checks): quali tion for persons performing the management
tative and quantitative fit testing proce planner role In public and commercial build
dures: variability between field and labora ings. Nevertheless, such persons may find
tory protection factors that alter respiratory this training and accreditation helpful In
fit (e.g., facial hair): the components of a preparing them to design or administer as
proper respiratory protection program: se bestos operations and maintenance programs
lection and use of personal protective cloth for public and commercial buildings.
ing: use, storage, and handling of non-dlspos- The management planner training course
able clothing, shall adequately address the following top
(k) Recordkeeping and writing the inspection ics:
report. Labeling of samples and keying sam (a) Course overview. The role and respon
ple identification to sampling location: rec sibilities of the management planner: oper
ommendations on sample labeling: detailing ations and maintenance programs: setting
of ACM inventory: photographs of selected work priorities: protection of building occu
sampling areas and examples of ACM condi pants.
tion: Information requir^ for Inclusion in (b) Evaluation/interpretation of survey re
the management plan required for school sults. Review of TSCA Title 11 requirements
buildings under ’TSCA Title II, section 203 for inspection and management plans for
(1)(1). EPA recommends that States develop school buildings as given In section 203(1) (1)
and require the use of standardized forms for of TSCA Title II: interpretation of Held data
recording the results of Inspections in and laboratory results: comparison of field
schools or public or commercial buildings, Inspector’s data sheet with laboratory re
and that the use of these forms be incor sults and site survey.
porated into the curriculum of training con (c) Hazard assessment. Amplification of the
ducted for accreditation. difference between physical assessment and
713
NYC-WTC_000139328
OCR can misread numbers and units. Confirm readings against the page image before using them.