Pt. 763. Subpt. E. App. C 40 CFR Ch. I (7-1-00 EdWon)
hazard assessment: the role of the manage turbance; procedures for recordkeeping. EPA
ment planner in hazard assessment: expla recommends that States require the use of
nation of significant damage, damage, poten standardized forms for purposes of manage
tial damage, and potential significant dam ment plans and Incorporate the use of such
age; use of a description (or decision tree) forms Into the Initial training course for
code for assessment of ACM: assessment of management planners.
friable ACM: relationship of accessibility, vi 0) Assembling and submitting tbe manage
bration sources, use of adjoining space, and ment plan. Plan requirements for schools in
air plenums and other factors to hazard as TSCA Title 11 section 203(1) (1): the manage
sessment, ment plan as a planning tool.
(d) Legal implications. Liability; insurance (k) Financing abatement actions. Economic
Issues specific to planners; liabilities associ analysis and cost estimates; development of
ated with interim control measures, in-house cost estimates; present costs of abatement
maintenance, repair, and removal: use of re versus future operation and maintenance
sults from previously performed inspections, costs; Asbestos School Hazard Abatement
(e) Evaluation and selection of control op Act grants and loans.
tions. Overview of encapsulation, enclosure, (1) Coutse review. A review of key aspects of
interim operations and maintenance, and re the training course.
moval; advantages and disadvantages of each
method; response actions described via a de 5. PROJECT DESIGNER
cision tree or other appropriate method;
work practices for each response action: A person must be accredited as a project
staging and prioritizing of work in both va designer to design any of the following ac
cant and occupied buildings: the need for tivities with respect to friable ACBM in a
containment barriers and decontamination school or public and commercial building: (1)
in response actions, A response action other than a SSSD main
(f) Role of other professionals. Use of indus tenance activity, (2) a maintenance activity
trial hygienists, engineers, and architects In that disturbs friable ACBM other than a
developing technical specifications for re SSSD maintenance activity, or (3) a response
sponse actions: any requirements that may action for a major fiber release episode. All
exist for architect sign-off of plans: team ap persons seeking accreditation as a project
proach to design of high-quality Job speci designer shall complete at least a minimum
fications, 3-day training course as outlined below. The
(g) Developing an operations and mainte project designer course shall include lec
nance (O&M) plan. Purpose of the plan; dis tures, demonstrations, a Reid trip, course re
cussion of applicable EPA guidance docu view and a written examination,
ments; what actions should be taken by cus EPA recommends the use of audiovisual
todial staff: proper cleaning procedures: materials to complement lectures, where ap
steam cleaning and HEPA vacuuming; reduc propriate.
ing disturbance of ACM; scheduling O&M for The abatement project designer training
off-hours; rescheduling or canceling renova course shall adequately address the following
tion in areas with ACM; boiler room mainte topics:
nance; disposal of ACM: In-house procedures
for ACM—bridging and penetrating (a) Background Information on asbestos.
encapsulants; pipe fittings; metal sleeves: Identification of asbestos; examples and dis
polyvinyl chloride (PVC), canveis, and wet cussion of the uses and locations of asbestos
wraps; muslin with straps, fiber mesh cloth; in buildings; physical appearance of asbestos.
mineral wool, and Insulating cement: discus (b) Potential health effects related to asbestos
sion of employee protection programs and exposure. Nature of asbestos-related diseases;
staff training: case study in developing an routes of exposure: dose-response relation
O&M plan (development. Implementation ships and the lack of a safe exposure level;
process, and problems that have been experi the synergistic effect between cigarette
enced) , smoking and asbestos exposure: the latency
(h) Regulatory review. Focusing on the period of asbestos-related diseases; a discus
OSHA Asbestos Construction Standard found sion of the relationship between asbestos ex
at 29 CFR 1926,58; the National Emission posure and asbestosis, lung cancer, mesothe
Standard for Hazardous Air Pollutants lioma, and cancers of other organs.
(NESHAP) found at 40 CFR part 61, Subparts (c) Overview of abatement construction
A (General Provisions) and M (National prq/ects. Abatement as a portion of a renova
Emission Standard for Asbestos); EPA Work tion project: OSHA requirements for notlfl-
er Protection Rule found at 40 CFR part 763, cation of other contractors on a multi-em
Subpart G; TSCA Title II: applicable State ployer site (29 CFR 1926.58).
regulations, (d) Safely system design speclBcatlons. De
(1) Recordkeeping for the management plan sign, construction, and maintenance of con
ner. Use of field inspector’s data sheet along tainment barriers and decontamination en
with laboratory results: on-going record closure systems: positioning of warning
keeping as a means to track asbestos dis- signs: electrical and ventilation system lock
714
NYC-WTC_000139329
OCR can misread numbers and units. Confirm readings against the page image before using them.