Pt. 763. Subpt. E. App. C 40 CFR Ch. I (7-1-00 Edition)
Owners consider such factors as cost effec 1, Information regarding types of ACM and
tiveness, the physical configuration of the Its various uses and forms,
work area, and the amount of traffic in the 2, Information on the health effects associ
area when determining which abatement ated with asbestos exposure.
method to use. 3. Descriptions of the proper methods of
If the owner chooses to enclose the struc handling asbestos-containing materials.
ture rather than to remove the asbestos-con 4. Information on the use of HEPA-
taining material insulating it, a solid struc equipped dual-cartridge respirators and
ture (airtight walls and ceilings) must be other personal protection during mainte
built around the asbestos covered pipe or nance activities.
structure to prevent the release of asbestos- Prohibited activities. The training program
containing materials Into the area beyond for the maintenance engineering staff should
the enclosure and to prevent disturbing describe methods of handling asbestos-con
these materials by casual contact during fu taining materials as well as routine mainte
ture maintenance operations. nance activities that are prohibited when as
Such a permanent (l,e,, for the life of the bestos-containing materials are Involved.
building) enclosure should be built of new For example, maintenance staff employees
construction materials and should be Impact should be Instructed:
resistant and airtight. Enclosure walls 1. Not to drill holes in asbestos-containing
should be made of tongue-and-groove boards, materials.
boards with spine Joints, or gypsum boards 2. Not to hang plants or pictures on struc
having taped seams. The underlying struc tures covered with asbestos-containing ma
ture must be able to support the weight of terials.
the enclosure. (Suspended ceilings with lald- 3. Not to sand asbestos-containing floor
in panels do not provide airtight enclosures tile.
and should not be used to enclose structures 4. Not to damage asbestos-containing mate
covered with asbestos-containing materials.) rials while moving furniture or other ob
All Joints between the walls and ceiling of jects.
the enclosure should be caulked to prevent 5. Not to install curtains, drapes, or divid
the escape of asbestos fibers. During the in ers in such a way that they damage asbestos
stallation of enclosures, tools that are used containing materials,
(such as drills or rivet tools) should be 6. Not to dust floors, ceilings, moldings or
equipped with HEPA-filtered vacuums. Be other surfaces in asbestos-contaminated en
fore constructing the enclosure, all elec vironments with a dry brush or sweep with a
trical conduits, telephone lines, recessed dry broom.
lights, and pipes in the area to be enclosed 7. Not to use an ordinary vacuum to clean
should be moved to ensure that the enclosure up asbestos-containing debris.
will not have to be re-opened later for rou 8. Not to remove celling tiles below asbes
tine or emergency meiintenance. If such tos-containing materials without wearing
lights or other equipment cannot be moved the proper respiratory protection, clearing
to a new location for logistic reasons, or if the area of other people, and observing as
moving them will disturb the asbestos-con bestos removal waste disposal procedures.
taining materials, removal rather than en 9. Not to remove ventilation system filters
closure of the asbestos-containing materials dry.
is the appropriate control method to use. 10. Not to shake ventilation system filters.
Maintenance program. An asbestos mainte
nance program must be initiated in all facili (52 FR 41894. Oct. 30. 1987]
ties that have friable asbestos-containing
materials. Such a program should Include: Appendix C to Subpart E—Asbestos
1. Development of an Inventory of all as Model Accreditation Plan
bestos-containing materials in the facility,
2. Periodic examination of all asbestos- /. Asbestos Model Accreditation Plan for States
containing materials to detect deterioration. The Asbestos Model Accreditation Plan
3. Written procedures for handling asbestos (MAP) for States has eight components:
materials during the performance of small- (A) Definitions
scale, short-duration maintenance and ren (B) Initial Training
ovation activities, (C) Examinations
4. Written procedures for asbestos disposal, (D) Continuing Education
5. Written procedures for dealing with as (E) Qualifications
bestos-related emergencies. (F) Recordkeeping Requirements for Train
Members of the building’s maintenance engi ing Providers
neering staff (electricians, heatlng/air condi (G) Deaccreditation
tioning engineers, plumbers, etc,) who may (H) Reciprocity
be required to handle asbestos-containing A, Definitions
materials should be trained in safe proce For purposes of Appendix C:
dures, Such training should Include at a min 1. “Friable asbestos-containing material
imum: (ACM)” means any material containing more