Update.
GenePal Water Quality and Quantity
As of September 1st the reservoirs were at 94.1% of capacity.
Normal capacity for this time of year
is 80.9%. Consumption for August 31st was 1367.2 million
gallons. The quality of
Catsltill/Delaware and Croton source water continues to be excellent.
Drinking Water Contest
On Tuesday August 15, DEP placed second in the Regional
Drinking Water Taste Contest
Sponsored by NYSDOH, held on the front steps of the Museum of
Natural
winner, Dix Hills, and second place (New York City) winners from the fi History. The first place
competed at the final round at the state fair in Syracuse, NY on August ve regional oontesta then
30th, NYC DEP was awarded
second place. First place went to Wells College from the Finger
Lakes region.
Discussion of Lead Issues
A meeting was held on August 24 with counsel concerning
two lead issues. The first discussion
centered on the preparation and review of a letter to the
NYSDOH reaffirming the auccessfbj
completion of three consecutive rounds of lead sampling. In
that letter we will ask the State for
confirmation and acceptance of what we perceive as the
ramifications of that sampling, namely,
ceasing lead notification requirements and lead service line
replacement, and reduction in future
sampling frequency. The second discussion concerned the possibility
of re-thsdmting the program
whereby DEP notified NYCDOH of locations where elevated lead
levels were detected during our
Consumer Lead Test Program.
Hill-view Reservoir and Jerome Reservoir
The contract for the construction of the permanent
hazardous chemical transfer containments
(BWS I11) commenced on August 11, 2000. The
contractor has already begun work on three (3) of
the five (5) containments required for Hillview Reservoir
Facilities, A Portacel vacuum liquid doser
was installed and put into operation at the Temporary
Chlorination Building at Hiliview Reservoir
on August 17, 2000. This was done to enable Reservoir Operations
to compare the performance and
dependability of this new technology against the conventional metering pumps originally installed
et this facility. It is hoped that this new type of equipment
will eliminate many of the problems and
breakdowns associated with the metering pump and its associated piping.
If successfltl, this type of
vacuum liquid doser will be incorporated into several upcoming
projects.
Jerome Reservoir
DEP staff began the draining of the North Basin of the Jerome
flow rate of 10 MOD. Once the basin is drained cleaning Reservoir on August 18, 2000 at a
of the basin will commence, Since the
South basin has already been cleaned, this will complete the
cleaning operations at Jerome.
-7-
on'A M1•CT MfV T dnC )CCC-CC-*T)-XP-1 fl Y
NYC-WTC 000137917
OCR can misread numbers and units. Confirm readings against the page image before using them.