NYC 9/11 Public Portal Document
Water Leak In Harding Park; Bronx
In the Bronx, DEP staff assisted the maintenance staff at Harding
Park, a private community, in
locating a water service which is scheduled to be decommissioned
and then abandoned. The service
that was leaking is a section that is no longer a necessary
part of the water supply to that community.
Damaged Water Main -- Murray Street; Queens
On Tuesday afternoon, August 29, 2000 a contractor installing
a catch basin on Murray Street, north
of Northern Boulevard, pulled the tap to an old
abandoned service line off a twenty inch water main.
DEP staff responded to the site and shut down the twenty inch
main and plugged the tap hole, The
water main was back in service at 9 p.m. No consumers were
affected.
Discharged into the Hutchinson River
On Wednesday August 30th the DEP contractor working on
the Hutchinson River CSO Storage
Conduit drilled into our Conner Street Pump Station Force Main.
DEP staff responded and the
Pump Station was shutdown. Sewerage was diverted to the Co-Op City
North Pump Station.
DEP's emergency contractor responded and repaired the damaged force main.
gallons of sewerage was discharged into the Hutchinson River Approximately 13,200
through the storm sewer system.
Sludge Vessel Removedfrom Servicefor Emergency Repairs
On August 241", one of NYCDEP's larger sludge vessels, the MN
Newtown Creek, suffered a main
engine failure. The vessel was en route to Wards Island carrying a load of
sludge from another plant
The engine was shut down and the vessel reached its berth under
reduced power. Our in-house
marine staff determined that the engine required bearing replacement as
opposed to shaft work which
would have required dry docking of the vessel. Marine staff was thus able to
complete the necessary
repairs to the engine bearing and other associated parts. The
vessel underwent fitness testing, and
was returned to service on the 30"'. The Department
maintains backup for incidents of this nature,
and made use of both a smaller sludge vessel, the MN Owls
Head, and a sludge barge to ensure
sludge production at treatment plants would not be interrupted.
Re•englneering/Planning
Plans to Bring Surface Water into All Parts ofJamatea Service
Territory
On August 24, an internal meeting was held between the upstate
and downstate water supply
Bureau's to discuss plans to bring upstate strrmce water into all parts of
the Jamaica service teriftoty.
There th an area in Queens (approximately 164th Street east to Francis
Lewis Blvd, and Hillside Ave
south to Jamaica Ave) where upstate surface water was presently
unavailable. Possible remedies
discussed Include 1) bringing 20-inch trunk mains up from South Conduit
and across from Sutphin
Blvd to the area, 2) bringing a 48-inch main (actual size be
to determined) to the area, and 3)
installing regulator valves to allow Douglaston water to be brought into the
area without excessive
pressure. It was decided that option k 1, with a 2-year time table, was
the most feasible. That option
is to be formalized into the Capital Construction
Program. .