NYC 9/11 Public Portal Document
At a meeting in early July, the County surprised the City by stating that it would
not
the accumulated MOA funds for diversion and demanding that the City commit an spend any of
million to the project ($25 million in diversion costs, plus $25+ million in additional $SO+
the host community). DEP has made it clear to the County that benefits for Peekskill as
it will abide by Its commitments in
the MOA, but will not commit additional funds to a diversion project
(other than the savings from
an avoided upgrade). The County has also recently expressed
an interest in a project that would
divert all 30 WW [Ps in the watershed. Due to the extreme position taken
by the County, talks have
stalled. From a water quality perspective, DEP believes that diversion of
the Yorktown WWTP is
desirable.
Mosquito Control Program ,
DEP has received delivery of all 100 Mosquito Magnets" contracted
for with funding from the
NYC Water Board. Ten Mosquito MagnetsTM have been loaned to
temporarily placed the loaned magnets in the Rockaways. The NYC DOH: DOH has
effectiveness of the magnets varies
by area and wind condition, but certain locations, Broad Channel for
instance, report very high
capture rates. Additionally, DEP continues to utilize its own exterminatory,
along with City-wide
contractors for spraying and fogging at Departmental sites. The Departa>ept hay
training program addressing occupational exposure to West Nile Virus also initiated a
(WNV). Staf 'throughout the
Agency is being made aware ofprotection against WNV, methods of
transmission, and idantifioadon
of the health effects.
Delaware County Fair
I attended the Delaware County Fair on Monday August 14, and
participated in a ribbon cutting
ceremony with Perry Shelton, President of the Board of Directors of the
Catskill Watershed
Corporation (C WC); and Dick Coombe and Alan White, Chair and Executive
of the Watershed Agricultural Council, DEP shared an exhibit Director, respectively,
booth with those two organizations.
We toured the fair grounds and visited with some farmers and
4-H youth in the livestock pavilions.
Altar the ribbon cutting, Delaware County Sheriff Tom Mills
presented me with two defibrillators
for use by DEP Police Officers patrolling the watersheds of
the Cannonsville and Pepacton
Reservoirs, Joining me was Robert Varieur, the new DEP Police Director.
these events. Local media covered
Newtown Creek WP.C.P. Contract NC-30G has been found to be non
-responsive
The bid submitted by John P. Piccone, Inc. / James M. McCullagh Co.,
Inc. (Joint Venture) the
Newtown Creek W,P.C.P. Contract NC-300 has been found to be non-responsive by for
our own
Agency Chief Contracting Officer. Pursuant to P.P.B. Rules, the Piccone / McCullagh Joint Venture
has appealed this determination to the DEP Agency Head. The Joint
Venture submitted several
supplements to its original written appeal and was afforded the opportunity to meet with the
Deputy Commissioner to discuss the appeal on August 30, 2000. Since the award of First
Contract NC-30
included as a milestone in the Newtown Creek consent degree a final meeting an the
appeal will
is
be issued shortly.
-3.
M1'.I 7O, OT MN T daC )ccS-CsS-RZJ:X21 CM
NYC-WTC 000137912
OCR can misread numbers and units. Confirm readings against the page image before using them.