NYC 9/11 Public Portal Document
Conunisioner Christopher 0. Ward
August 9, 2004
Page 3
Commissioner to
Moreover, while Article 5a of the Contract allows the
that amount was required to be
retain from Termon's final payment a sum as security,
ever fixed. Therefore, especially
fixed in the Contract's specifications. No such sum was
Contract, it is clear that no money was
in light of the type of work performed under the
N intended to be withheld.
billings total
It is Termon's understanding that the approved contract
$213,800.57 in retainage.
$2,138,005.65. Based on that amount, the DEP is holding
needs to be conducted to verify
While a final accounting of the approved contract billings
withhold Termon's retainage.
this amount, there is no basis for the DEP to continue to
3. Cleaning of HVAC Units In Residential Apartments--$913,000.00
of Work on
With the invitation to Bid, the contractors were given a Scope
the Contract's Scope
which to base their bids. For ease of reference, a separate copy of pre-bid meeting,
I a mandatory
of Work is annexed hereto as Exhibit B. While there was contingencies of the
no site inspection was allowed nor was it possible due to
the
exclusively on the information
situation. As a result, the bidders were forced to rely
Contract's Scope of Work, in
contained in the Scope of Work provided to them. The
obligated to perform.
fact, omitted a significant amount of work that Termon was
Scope of Work A concerned "the cleaning of minimal dust accumulations
HVAC systems and (c) in the
(light coating)" in (a) common spaces, (b) in the buildings'
conditioning units in residential
• residential spaces. With regard to heating and/or air
and clean the
apartments, the Scope of Work only required Termon to remove
"first foot of duct work"
«[i]ntake/discharge re tsters of HVAC systems", to vacuum the
•
emphasis added) and to remove and
of the HVAC systems. (Scope of Work A, ¶3.h, ¶3.i). This was the
Work A,
vacuum "[w]indow and room air conditioners" (Scope of
or systems which was a part of
extent of the cleaning of any of the mechanical appliances
the Scope of Work provided prior to bid.
the window air
Upon commencing work, it was discovered that besides
individual HVAC through-
conditioners and HVAC registers, the apartments contained
was not mentioned in the Scope
wall units. The necessity of cleaning these types of units
Quandrant D where Termon performed its
of Work for the Contract. Every apartment in at least one
work c iatieasttwo of these HVAC units-one in each bedroom and
based on the number of
unit in the living room/dining room. Termon's claim is
room/dining room area. For
w; , < bedrooms in each apartment plus one unit for the living
for two HVAC units. For a
example, for a one bedroom apartment, Termon is claiming
HVAC units.
two bedroom apartment, Termon is claiming for three
the window air
While it may be argued that there is no difference between
HVAC units, they are, in fact,
conditioning units specified in the Scope of Work and the
additional work to clean.
significantly different and required significant amounts of
..:;ar':x....o-::m..<I..~ was•:,.... .
NYC-WTC 000135957