NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 55/No folder label
Document / 283 pages

EPA review letter, 133-135 Greenwich Street

Machine-extracted title · confidence 90%

US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134398
OCR text

OCR status: ok · source: pdftotext

NYC 9111 Public Portal Document

Part III — Health & Safety Plan 133-135 Greenwich StreeV21-23 Thames Street Airtek Project 05-0701— Rev 3, August 29, 2005

1910.120(a) (i) and appropriate annual refresher training as required. This HAZWOPER training requirement may be removed, should sampling indicate training requirement downgrade is appropriate.

2.10 PERSONAL PROTECTIVE EQUIPMENT TRAINING

Each Subcontractor shall provide training concerning the use of PPE to their personnel, as specified by this plan, to address the general PPE requirements and any specific requirements for PPE they may use, such as fall protection. The Contractor SSM or CSOCSO can assist with this training, and any concerns regarding the use of appropriate PPE shall be brought to the attention of the Contractor SSM. Further discussion of the types of PPE is presented in Subsection 2.5 of this HASP

2.10.1 Emergency Response Training

Emergency response training, in accordance with the Emergency Action Plan found within Section 2 of this HASP, shall be provided to all on-site-personnel as part of the site-specific safety and health awareness training. The emergency response training shall be conducted by each Subcontractor's Safety Officer for her respective employees. At a minimum, the topics of this training shall include the following:

• Location of all site emergency equipment • Response procedures for fires • Response procedures for injuries and accidents • On-site/off-site response resources • Emergency site operations shut down procedures • On-site "Chain of Command" • Designated on-site emergency meeting location • Recognition of evacuation signals and alarms

2.10.2 Visitor Training

Authorized Visitor: The client, his representative and any representative of a regulatory or other agency having jurisdiction over the project.

During the Abatement Phase all visitors entering the EZ must provide proof of an up-to-date fit- testing and medical clearance, and completion of asbestos certifications required for the employee's scope of work. In addition each visitor will receive site-specific training by the Contractor SSM or CSOCSO that includes:

• Location and description of potential hazards and risks • Required PPE • Areas of the site that may be closed to visitors • The site evacuation plan and emergency procedures • Other Topics as deemed appropriate by the Contractor SSM

31

NYC-WTC 000134398

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134398Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →