PROJECT MONITOfl LOG Part 1
1. Client: 2S Narrle~
' f roje #: ~ 5. Work Area(s):
L1,, Gll G
C r 3. Prpie Ad e~s~,~ s ,r 4a. Task
6. Contractor: 7. Contractor's Foreman: 1 8. ATC Representative: 9 ate:
$c -r- ~3mX, ti jcuu
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. ft., 260 lin. ft.)
Phase of Abatement: __ Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): —~ Yes __ No 4. Wall Poly: Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes _. _ No 8. Pre-cleaning: __ Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
• Yes (Complete I - 5)
Removal: N/A
1. Type of ACM: Pipe Insulation __ Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in. of water: Yes No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes __ No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage __ 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: _ Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No _ N/A
5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal:
1. Type of ACM: Pipe Insulation __ Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
• 2. Method or Removal:
(If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
Gross removal within tent
Yes No
Glovebag removal within tent (check 3 through 8)
4. Glovebags attached to smooth surface: Yes No
5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: _ Yes No
Continued on Back Form NY-8 1
NYC-WTC 000129576