NYC 9/11 Public Portal Document
V TC
1 . Client:
PROJECT MLONITO LOG :'art i
2. roj Name: 4/ ole O pQ?i 5. Work Area(s):
) Y2 3. Project A rests, - S, 4a. Task #: C~~~
Zi
6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9. Date:
f 1or.J '
Type of Project: Full-Containment Tent-Containment Glovebagging Other
Size of Project: Large (> 160 sq ft., 260 tin. ft. of ACM) Small (< 160 sq. ft , 260 fin. It)
Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: __ Yes (Indicate prep work performed in 1 - 10) N/A (II already completed)
1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No
3. Critical Barriers (CBs): Yes No 4. Wall Poly: __ Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: __ Yes No
9. Prep work completed: Yes No 10. Temporary Power: Yes No
11. Other Yes _ No 12. Prep-Inspection Passes: __ Yes No (Explain why)
Removal: Yes (Complete 1 - 5) N/A
1. Type of ACM: _` Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other:
2. Negative air pressure > 0.02 in. of water: Yes __ No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1 . ___ 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: , Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section):
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No
3. Construction of Decon: __ Yes No 4. Negative Air: Yes No N/A
5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No
Removal:
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation __ Transite Boards Floor Tile Other:
2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
(If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: _ Yes No
5. Amended water used: _ Yes _ No 6. Removal included cleaning and encapsulation:_ Yes No
7. Open/damaged ends of insul. sealed: Yes _ No 8. Glovebags vacuumed, double-bagged: Yes No