Project management log signature form, unknown date

Machine-extracted title · confidence 95%

Form requiring acknowledgment of accurate project information and a signature from an ATC Associates representative.

NYC-WTC_000107832–000107837

Folder label: “120 Liberty St / 125 Cedar St - MMU -

Page image
Scanned page image, NYC-WTC_000107835
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

V TC 1 . Client: PROJECT MLONITO LOG :'art i 2. roj Name: 4/ ole O pQ?i 5. Work Area(s):

) Y2 3. Project A rests, - S, 4a. Task #: C~~~ Zi 6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 9. Date:

f 1or.J '

Type of Project: Full-Containment Tent-Containment Glovebagging Other

Size of Project: Large (> 160 sq ft., 260 tin. ft. of ACM) Small (< 160 sq. ft , 260 fin. It)

Phase of Abatement: Pre-abatement Sampling Prep Removal Cleaning

Encapsulation Waste Load-out Finals

FULL-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: __ Yes (Indicate prep work performed in 1 - 10) N/A (II already completed)

1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: __ Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: __ Yes No 9. Prep work completed: Yes No 10. Temporary Power: Yes No 11. Other Yes _ No 12. Prep-Inspection Passes: __ Yes No (Explain why)

Removal: Yes (Complete 1 - 5) N/A

1. Type of ACM: _` Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other:

2. Negative air pressure > 0.02 in. of water: Yes __ No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No

Cleaning: Yes (Complete 1 - 6) N/A

1 . ___ 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: , Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No

TENT-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)

1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: __ Yes No 4. Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No

Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation __ Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)

(If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: _ Yes No 5. Amended water used: _ Yes _ No 6. Removal included cleaning and encapsulation:_ Yes No 7. Open/damaged ends of insul. sealed: Yes _ No 8. Glovebags vacuumed, double-bagged: Yes No

Continued on Back Fnrm AIV_R 1/ni

NYC-WTC 000107835

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107835Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →