NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/No folder label
Document / 6 pages

Project management log signature page, WTC site

Machine-extracted title · confidence 50%

Signature page from a project management log verifying the accuracy of environmental data for a WTC project.

NYC-WTC_000108822–000108827
Page image
Scanned page image, NYC-WTC_000108825
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

U 1. Client: TC PROJECT MONITO LOG ~ part r, 2 roj N C J 4. oje O o02 5. Work Area(s): -~Q P &. *" 3. Project ress: _1) S I 4a. Task # G_. T 6. Contractor: 7. Contractor's Foreman: 8. ATC Representative: 1g. Date.

'-

Type of Project: Full-Containment Tent-Containment __ Glovebagging Other Size of Project: Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. ft., 260 lin. ft.) Phase of Abatement: ,_ Pre-abatement Sampling Prep Removal Cleaning

Encapsulation Waste Load-out Finals

FULL-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed) 1. Construction of Decon: Yes No 2. Ceiling Poly: Yes No 3. Critical Barriers (CBs): Yes No 4. Wall Poly: Yes No 5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No 7. Negative air: Yes No 8. Pre-cleaning: Yes No 9. Prep work completed: Yes No 10. Temporary Power: Yes No 11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)

Removal: Yes (Complete 1 - 5) N/A 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Negative air pressure > 0.02 in. of water: Yes _ No 3. Amended water used during removal: Yes No 4. Critical barriers intact for shift's duration: Yes No 5. Proper Decon procedures followed: Yes No Cleaning: Yes (Complete 1 - 6 ) N/A

1. 1st Stage __ 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning: 3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No 5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6. 1/12-hour waiting period after 3rd cleaning: Yes No

TENT-CONTAINMENT ABATEMENT

Work Area Location (floor, room, section):

Preparation of Work Area: Yes (Indicate prep work performed in 1 - 6) N/A (If already completed)

1. Construction of Tent: Yes No 2. Pre-cleaning: Yes No 3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A 5. Prep work completed: Yes No 6. Pref-inspection passes: Yes No

Removal: 1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing Ceiling Tile Boiler Insulation Transite Boards Floor Tile Other: 2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8) (If Glovebag Removal Check 3 through 8) 3. Glovebags smoke-tested: Yes No 4. Glovebags attached to smooth surface: Yes No 5. Amended water used: Yes No 6. Removal included cleaning and encapsulation: Yes No 7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged: Yes No

Continued on Back Form NY-8 1/01

NYC-WTC 000108825

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000108825Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →