Asbestos inspection report, 70 Fulton Street, September 2002

Machine-extracted title · confidence 95%

Inspection report documenting roof and east facade cleanup activities with air sampling and visual debris checks.

NYC-WTC_000129349

Folder label: “70 FULTON STREET 1001184, 76/28

Page image
Scanned page image, NYC-WTC_000129349
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document + Asbestos Inspection Report Premise No. Floor PODE & FACADE 70 Zip 10038 Inspector Dennis Antzoulatos FULTON STREET Borough 1 Building Type MIXED USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Raiph Avenue, Brooklyn State Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 StreetNew York State NY Zip Phone 10017 (212) 922-0077 Contact Person TBlock 76 Lot 28 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: AS NOTED Squad # Badge # N/A A020 Photos Taken YesND Address City State Zip Phone Time of Inspection from: As NOTEO TUESDAY SEPTEMBER 24 2002 CONTRACTOR BROUGHT EQUIPMENT AND MATERIALS TO THE WORK SITE: - REMOTE DECONTAMINATION UNIT WAS EREGTED ON THE ROOF OF THE PREMISE. WEDNESDAY SEPTEMBER 25 2002 THE CUAN UP OF THE ROOF OF THE PREMISE BEGAN TODAY. AIR SAMPUNG FOR TODAU'S CLEAN UP ACTIVITTES LAS PERFORMED B4 DIPO ELEMO (CERTIFICATE # AM 01-14694 EXP 03/03) OF WARREN $ PANZER, THUPSDAY SEPTEMBER 28 2002 THE CLEAN UP QE THE RODE QF THE PREMISE WAS COMPLETED. AIR SAMPUNG FOR TOPAY'S CLEAN UP ACTUmES WAS PERFORMED BY ARTHUR C. SETTER (CERTIFICATE # AH 97-06135 EXP 03/03) AT THE COMPLETION OF CUEANING ACTUITIES I CONDUCTED A VISUAL INSPECTION OF THE CLANED ROOF SURFACES AND I OBSERUED NO VISIBLE CUTC DEERIS. THE CUEAN UP CE THE EAST FACADE DF THE PREMISE IS SCHEDULED FOR SATURDAY SEPTEMBETE 28 2002, SATURDAL SEPTEMBER 28 700% THE CLEAN UP DF THE EAST FACADE CAS CONDUCTED. A DYKE WAS CONSTRUCTED IN THE ALLEY (RIDERS ALLEY) TO COUECT WATER RIN OFF. A DECAN TRUCK WAS UTILIZED. FACADE SURFACES LERE ACCESSED USING EXTENSION LADDERS. AIR SAMPUNG MAS PERFORMED BY EDMAN DIBRA (CERTIFICATE # AM 01-12337 EAP 02/03) OF WARREN I PANZER, UPON COMPLETION OF CUEANING ACTIVITIES, I CONDUCTED A VISUAL INSPECTION OF THE CUEAED FACADE SURFACES AND I OBSERVED NO VISIBLE WTC DEBRIS. THE CUEAN UP PROJECT AT THE PREMISE IS NOL COMPLETE. NYC-WTC_000129349

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000129349Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

3 shared non-person entities · 1 shared topics · similarity 0.985

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.