NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 52/102-104 FULTON STREET 1001196, 78/21
Document / 4 pages

Waste manifest form for 102-104 Fulton Street

Machine-extracted title · confidence 85%

Manifest form documenting the transport or disposal of waste materials from the 102-104 Fulton Street site.

NYC-WTC_000128677–000128680

Folder label: “102-104 FULTON STREET 1001196, 78/21”

Page image
Scanned page image, NYC-WTC_000128680
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report • Premise No. Floor 102-104 FULTON STREET FACADE Zip 10038 Borough 1 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person ONSITE : MARC KREFT OFFICE: YAIR LIVY Block 78 Inspection Date: AS NOTED Squad # Badge # 21 N/A A020 Basis of Inspection Phiotos Taken WTC Survey (YesNo Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name LEGACY FULTON Address IlI GREAT NECK ROAD State Zip City Phone GREAT NEOK NY 11021 (516) 466-4992 Time of Inspection from: AS NOTED MONDAY JULY 22, 2002 8:00AM-2:00PM SCAFFOLDING (MOVINA SWING) SET UP FOR THE FACADE CUEAN-UP OF THE PREMISE: VACUUMING AND WASHING WILL BE DONE TOMORROrO. TUESDAY JULY 23,2002 8:00 AM WORKERS BEGIN VACUUMING OF BULK DEBRIS FROM THE WWDOW LEDGES AND THE FACADE SURFACE. 12:30PM VACUUMING OF BULK MATERIAL HAS BEEN COMDUETED. WORKERS BREAK FOR LIKCH. 1:00 PM WASHING OF FACADE (NORTH - FULTON STREET) BEGINS. 5:00PM WASHING OF FACADE HAS BEEN COMPLETED. 5:00PM-5:20PM I CONDUCÍ A VISUAL OF THE CUEANED FACADE SURFACES AND OBSERUE NO VISIBLE. WTC DEBRIS. AIR SAMPUNG FOR THIS PROJECT WAS PERFORMED BY JOHN BOYD OF WARDEN & PANZER ENGINEERS. FIVE ALR SAMPLES WERE RUN ON THE SIDEWAUK: OUTSIDE THE WORK AREA. 5:30PM WORKERS BEGIN DISMANTUNG THE PLASTIC DYKE USED TO COUECT RUN-OFF WATER FROM THE FACADE CUEAN-UP. BAG-OUT ACTINITIES BEGIN. 6:00PM BAG-OUT ACTIVIMES ARE COMPLETED. WORKERS VEAVE THE JOBSITE. THE CUEAN UP FOR THIS PREMISE IS NOU COMPLETED. NYC-WTC_000128680

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128680Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →