NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/102-104 FULTON STREET 1001196, 78/21
Document / 4 pages

Waste manifest form for 102-104 Fulton Street

Machine-extracted title · confidence 85%

Manifest form documenting the transport or disposal of waste materials from the 102-104 Fulton Street site.

NYC-WTC_000128677–000128680

Folder label: “102-104 FULTON STREET 1001196, 78/21

Page image
Scanned page image, NYC-WTC_000128680
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report • Premise No. Floor 102-104 FULTON STREET FACADE Zip 10038 Borough 1 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person ONSITE : MARC KREFT OFFICE: YAIR LIVY Block 78 Inspection Date: AS NOTED Squad # Badge # 21 N/A A020 Basis of Inspection Phiotos Taken WTC Survey (YesNo Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name LEGACY FULTON Address IlI GREAT NECK ROAD State Zip City Phone GREAT NEOK NY 11021 (516) 466-4992 Time of Inspection from: AS NOTED MONDAY JULY 22, 2002 8:00AM-2:00PM SCAFFOLDING (MOVINA SWING) SET UP FOR THE FACADE CUEAN-UP OF THE PREMISE: VACUUMING AND WASHING WILL BE DONE TOMORROrO. TUESDAY JULY 23,2002 8:00 AM WORKERS BEGIN VACUUMING OF BULK DEBRIS FROM THE WWDOW LEDGES AND THE FACADE SURFACE. 12:30PM VACUUMING OF BULK MATERIAL HAS BEEN COMDUETED. WORKERS BREAK FOR LIKCH. 1:00 PM WASHING OF FACADE (NORTH - FULTON STREET) BEGINS. 5:00PM WASHING OF FACADE HAS BEEN COMPLETED. 5:00PM-5:20PM I CONDUCÍ A VISUAL OF THE CUEANED FACADE SURFACES AND OBSERUE NO VISIBLE. WTC DEBRIS. AIR SAMPUNG FOR THIS PROJECT WAS PERFORMED BY JOHN BOYD OF WARDEN & PANZER ENGINEERS. FIVE ALR SAMPLES WERE RUN ON THE SIDEWAUK: OUTSIDE THE WORK AREA. 5:30PM WORKERS BEGIN DISMANTUNG THE PLASTIC DYKE USED TO COUECT RUN-OFF WATER FROM THE FACADE CUEAN-UP. BAG-OUT ACTINITIES BEGIN. 6:00PM BAG-OUT ACTIVIMES ARE COMPLETED. WORKERS VEAVE THE JOBSITE. THE CUEAN UP FOR THIS PREMISE IS NOU COMPLETED. NYC-WTC_000128680

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128680Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →