NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/102-104 FULTON STREET 1001196, 78/21
Document / 7 pages

Invoice for environmental services, 102-104 Fulton Street

Machine-extracted title · confidence 95%

Invoice from Benjamin Kurzban & Son Control Inc. dated August 1, 2002, for work at 102-104 Fulton Street.

NYC-WTC_000128658–000128664

Folder label: “102-104 FULTON STREET 1001196, 78/21

Page image
Scanned page image, NYC-WTC_000128661
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. 102-104 FULTON STREET Floor Zip Borough Block FACADE 10038 78 Inspector Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State NY Zip Phone 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street City New York State NY Zip Phone 10017 (212) 922-0077 Contact Person ONSITE : MARC KREFT OFFICE: TAIR LIVY Lot 21 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name LEGACY FULTON Address I11 GREAT NECK ROAD State NY Zip 11021 Time of Inspection from: Inspection Date: AS NOTED Squad # Badge # N/A A020 Photos Taken Yes No City Phone GREAT NECK (56)466-4992 AS NCTED MONDAY JULY 22, 2002 8:00AM-2:00PM SCAFFOLDING (MOVING SWING) SET UP FOR THE FACADE CIEAN-UP OF THE PREMISE. VACUUMING AND WASHING WILL BE DONE TOMORROLO. TUESDAR JULY 23, 2002 8:00 AM WORKERS BEGIN VACUUMING OF BULK DEBRIS FROM THE WWDOW LEDGES AND THE FACADE SURFACE. 12:30 PM VACUUMING OF BULK MATERIAL HAS BEEN COMPLETED. WORKERS BREAK FOR LUCH. WASHING OF FACADE (NORTH - FULTON STREET) BEGINS. WASHING OF FACADE HAS BEEN COMPLETED. 5:00PM. 5:20PM I CONDUCT A VISUAL OF THE CLEANED FACADE SURFACES AND OBSERUE NO VISIBLE WTC DEBRIS. AIR SAMPUNG FOR THIS PROJECT WAS PERFORMED BY JOUN BOYD OF WARREN & PANZER ENGINEERS. FIVE ALE SAMPUES WERE PUN ON THE SIDEWAUK. 5:30PM OUTSIDE THE WORK AREA. WORKERS BEGIN DISMANTUING THE PLASTIC DYKE ÜSED TO COUECT RUN.UFF WATER FROM THE FACADE CUEAN-UP. BAG-OUT ACTINITIES BEGIN. 6:00PM BAG-OUT ACTIVITIES ARE COMPLETED. WORKERS LEAVE THE JOBSITE. THE CUEAN UR FOR THIS PREMISE Is Now COMPLETED. NYC-WTC_000128661

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128661Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →