NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/102-104 FULTON STREET 1001196, 78/21
Document / 4 pages

Waste manifest form for 102-104 Fulton Street

Machine-extracted title · confidence 85%

Manifest form documenting the transport or disposal of waste materials from the 102-104 Fulton Street site.

NYC-WTC_000128677–000128680

Folder label: “102-104 FULTON STREET 1001196, 78/21

Page image
Scanned page image, NYC-WTC_000128678
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 102-104 FULTON STREET Floor Zip Borough Block FACADE 10038 Inspector 1 78 Building Type Dennis Antzoulatos COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person ONSITE: MARC KREFT OFFICE: YAIR LIVY Lot 21 Basis of Inspection WTC Survey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name LEGACY FULTON Address City III GREAT NECK ROAD State NY Zip Phone 11021 Time of Inspection from: Inspection Date: AS NOTED Squad # Badge # N/A A020 Photos Taken Yes No GREAT NECK (516) 466-4992 AS NOTED MONDAY JULY 22, 2002 8:00AM1-2:00PM SCAFFOLIDING (MOVINGI SWING) SET UP FOR THE FACADE CUEAN-UP OF THE PREMISE. VACUUMING AND WASHING WILL BE DONE TOMORBOLO. TUESDAY 8:00 AM JULY 23, 2002 WORKERS BEGIN VACUUMING OF BULK DEBRIS FROM THE WIDOW LEDGES AND THE FACADE SURFACE. 12:30PM 1:00 PM 5:00 pM VACUUMING OF BULK MATERIAL HAS BEEN COMPLETED. WORKERS BREAK FOR LINCH. WASHING OF FACADE (NORTH - FULION STREET) BEGINS. WASHING OF FACADE HAS BEEN COMPLETED. 5:00PM-5:20PM I CONDUCT A VISUAL OF THE CLANED FACADE SURFACES AND OBSERUE NO VISIBLE WTC DEBRIS, AIR SAMPUNG FOR THIS PROJECT WAS PERFORMED B4 JOHN BOYD OF WARDEN & PANZER ENGINEERS. FIVE ALR SAMPLES WERE PUN ON THE SIDEWALK OUTSIDE THE WORK ADEA. 5:30PM WORKERS BEGIN DISMANTUNG THE PLASTIC DYKE USED TO COUECT RUN-OFF WATER FROM TRE FACADE CUEAN-UP. BAG-OUT ACTIVITIES BEGIN. 6:00PM BAG-OUT ACTINITES ARE COMPLETED. WORKERS LEAVE THE JOBSITE. THE CUEAN UP FOR THIS PREMISE 1S NOW COMPLETED. NYC-WTC_000128678

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128678Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →