NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/94 1/2 GREENWICH ST.
Document / 5 pages

WTC debris inspection form, 94 1/2 Greenwich Street

Machine-extracted title · confidence 95%

Form for recording facade inspection results regarding WTC debris at 94 1/2 Greenwich Street.

NYC-WTC_000128520–000128524

Folder label: “94 1/2 GREENWICH ST.

Page image
Scanned page image, NYC-WTC_000128523
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

~ ~ C NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program gqg t 59-17 Junction Boulevard, 8°t Hoar,Corona. NY 11308-5107 iMr/ ' '`°~, ' ASBESTOS PROJECT NOTIFICATION FORMS V.7LL BE (ASBESTOS INSPECTION REPORT) v ae iyc4!j!!pJ ACCEPTED Bugs, the original form and three (3) copies with original When Submitting tNs.form at the NYC Department ofrequires required. Submittal at the NYCDEP one copy of the form with original signatures. This signatures are week In advance of the start of abatement activities. form must be submitted to the NYC DEP not less than one

1. FACILITY GREENWICH STREET Borough Manhattan Zip 2. Address 94112 3. Block 4. Lot AKA 6. Name of Building 5. Type of Facility 11. BUILDING OWNER 8. Contact Person 7. Name

9. Tel.# Fax# City State Zip 10. Address

Ill GENERAL CONTRACTOR Tel. # 11. Name

IV. ASBESTOS ABATEMENT CONTRACTOR STEVEN PARMIGIANI ASBESTOS REMOVAL CORP- 13. Contact Person 12. Name TRIO P11 15. Tel. # (718) 961-4100 Fax# (718) 961-4103 14. Federal Employer l0. # State NY Zip 11356 STREET City COLLEGE POINT 16. Address 14-20129

V. THIRD PARTY AIR MONITOR MIKE NOLAN PANZER ENGINEERS, P.C. 18. Contact Person 17. Name WARREN & 20. Tel. # (212) 922-0077 Fax # (212) 922-0630 19. Federat Empioyer ID. # EAST 45 STREET NEW YORK ' State NY Zip 10017 21. Address 228 _____ city WARREN & PANZER ENGINEERS, P.C. 23. NYS DOH ELAP # 11251 22. Sample Analysis Laboratory

VL PROJECT INFORMATION ~~ 1 07 oz Projected completion date __u~, , . 7/02 24. Starting date for this portion of work__________ ,$Wday Asbestos work schedule 0 Monday 0 Tuesday 0 Wednesday 0 Thursday 0 Friday 0 da `~,

Shift from: 8:00 0 am ❑ pm to 8:00 Cl am 0 pm

If other, specify she Indicated In this Item. Access to Mspect the premises must be Provided dudng the work

be abated during this work 25. Total amount of asbestos-containing material to 1,920 Square Feet, and/or Unear Feet

NYC-WTC 000128523

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128523Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →