NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 52/96 GREENWICH STREET 1001056, 53/39
Document / 3 pages

DEP final notice, WTC debris cleanup, 96 Greenwich, September 2002

Machine-extracted title · confidence 88%

NYC DEP final notice offering World Trade Center debris cleanup program for building with observed exterior contamination.

NYC-WTC_000128502–000128504

Folder label: “96 GREENWICH STREET 1001056, 53/39

Page image
Scanned page image, NYC-WTC_000128503
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2'.1TC. NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program 59-17 Junction Boulevard. 8 Floor, Carona, NY 11368-5107 Biding Dept. or TRU N< rr. FOR OFFKr?AL USE ONLY ASBESTOS PROJECT NOTIFICATION ,. ~S (ASBESTOS INSPECTION REPORT) 1. ;j 4 www.e e. ov oa :~ '9~c P7ED

When submitting this form at the NYC Department of Buik6ngs, the original form and three (3) copies with o.1 nal signatures are required. Submittal at the NYCOEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.

1. FACILITY 2. Address 96 GREENWICH STREET Borough Manhattan Zip!

AKA 3. Block 4. Lot

5. Type of Facility 6. Name of Building II. BUILDING OWNER 7. Name 8. Contact Person

9. Tel.# Fax#

10. Address City State Zip

11L GENERAL CONTRACTOR

11. Name Tel. #

IV. ASBESTOS ABATEMENT CONTRACTOR

12. Name TRIO ASBESTOS REMOVAL CORP. 13. Contact Person STEVEN PARMIGIANI 15. Tel. # (718) 961-4100 Fax # (718) 961-4103 Oty COLLEGE POINT State NY Zip 11356 16. Address 14-20129 STREET V. THIRD PARTY AIR MONITOR

17. Name WARREN & PANZER ENGINEERS, P.C. 18. Contact Person MIKE NOLAN

19. Federal Employer ID. # 20. Tel. # (212) 922-0077 Fax # (212) 922-0630

21. Address 228 EAST 45 STREET city NEW YORK' State NY 21p 10017

ENGINEERS, P.C. 23. NYS DOH ELAP # 11251 22. Sample Analysis Laboratory WARREN &PANZER VL PROJECT INFORMATION 7/i) 2- Projected completion date /// 17f 2' 24. Starting date for this portion of work

Asbestos work schedule 0 Monday 0 Tuesday 0 Wednesday 0 Thursday 0 Friday 0 Saturday 0 Sunday

Shift from: 8:00 0 am 0 pm to 800 ❑ am 0 pm / > > 12 r 1 , ~• . spefy

Access b 6rspeet the pvrNses must be provided during the work schedule Indicated in this Item.

25. Total amount ofasbestos-containing material to be abated during this work ~s

3,420 Square Feet, and/or 0 Linear Feet ACP 7 212001 -. .

NYC-WTC 000128503

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000128503Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →