Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.

NYC-WTC_000125698–000125753

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125711
OCR text

OCR status: ok · source: pdftotext

• •

NYC-WTC

• • 000125711

VI/LI/LVVO

Information,

We

removed

work. resistant

and dispaaahta

surface

Upon

e.

waiting

will

wet tools

L After

AU and

retrrovcd

IW

utl11hc

shampoo,

filtration respirators storage

a

consisting

will

Yer Clean'tpprocedure1Bag-old Removal

I►rstalladort

hope

planed

methods,

areas

be

any

for VO.LL Upon Lea completion

establishing

will Olezowskl ly shall

period made to

duct

of

Root and this

oas manual 494 E.41 Street,Paterson, NJ 07504

from

wash system.

will

bag

and

Inun

clean

of

filters, rnA Fax:(973)345.4665

completion

of please

of

disposed be

explanation

tape, 01/26/2005 0821

by

After

outfaces

shower,

be

ACM

we

disposable will

the

Of

an Rrork Procedures down rs, coated NYC 9/11 Public Portal Document Prcr*Bct Manager asbestos

methods

clothes;

sealed

of

CrWcat

Filtered

additional

will b4b six

areas. labeled

and

be

eel

the

the

the

air

of

to

b

dirty

with start not

others

tree ACM AAbeetos Abatement Contractor

of roug 4(G Stripping,

off

as

All

moots

changes

single

supervisor

the

.

towels.

cr &,.dens,

each

and

water

being

ACM

with

removal

to'coruiot transparent

room,

ht

removal Phone:(975)34602 penetrations

6-mit

decontarn

persoaaJ

material

OGV( brought

over

with

sett

ACM

shell

isolation

abated Posting Signs Ssyxenve euReaaow4Ins 17325653654 Shower per

and

floor

area,

and

dis

to

to

ymur

of

area

ACM.

hour,

posable

be

shall

me

bags,

t

Is

protective

a

h

Ination

ensure down

VAT.

tilra

&muq

will

e

clean

adequately

discharged

appMv

at

In

barriers and

weer

d

follow

each

o

to

The your•

and

be shall

unit

-con

to

seism.

bag. the

ac

unit room.

the

oovured

the

shall

ceptable

sloth

A abatement

asbestos

will earllest

cquipmenh,

ebaonco be

L

unit L2V21 s-4 double

th

The

shall rein(oromd polrcu•ethane on the

waste

wetted

to

Should e

J"rior

rendered

This

per

be

same

(wash

the

a

second

with " Danger Asbestos'° warning signs, in English. Spanish, and the language spoken by the crew members,

contain

drained,

$ewer.

401-81(k),(1).

convenience

visual.clesamnnce,

bags,

container

containing

unit

to of

floor Abatement offloor enveringlmwfio (29,1 II)Sgft), wall and columns plaster (7,311)sq ft.) and

team

will Section 1-81(m): Partial plastieiziz.inn of the work arca(s).

bag

your

the

debris

The two room),

free We are rr uatting a variance from the following subsections

will

disposable

Tie

will

be

shelves

out

have

completion

will

collected

layers

shower

using

of

dire

also

for

on

sequence

Waste

be

whorp be posted at 411 entrances to the working area,

material

visible

be

in

All

ny

the

storage

sealed.

be

tly of

for

equped

myy (2) layers or aix rail fire retardant polyurethane sheeting, and two Aix mil

room

will

fl movable

ruJ

all 6

unit and

the

bagged.

storage construction Corp.

-mil

oor,

o of

debris. LIARS 'COAST$ A,Z MAT REMOVAL,INC

offica

lY

critical' as shall

be

bags

The

until shall each

filtered

will

sheathed

mentioned

plastio

after

aeaurod

with

be

walls

A of

objects shall

have or NOVA DEVELOPMENT CiRP

the shift,

contain

All 8. Jnstallatdon of Worker/Waste Decpntamination Vni

barriers

that

visual

removed

resplratvrs,

need

through

appropriate

sheeting. nomnlatlon

exposed

Inside of

wanhroorc

with

the

and

will

above.

the

additional

wáuwJ

liquid

inspection

single

will

one

water

a

find,

work

using

be

scion

floor This floor of the decontamination unit. The clean room will include shelves, and

towels,

be

hour

soap

dawn

hind

of be etteched the work This taesnite panels(1,066sq.ft.)' We sbsli comply with attachment VA.

to

by

area

two he Installed

& clean sealable plastic bags for

three chambers divided by air lock

PAGE 19 010/013 10

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125711Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →