NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125609
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY b) Full face piece powered air-purifying respirators (PAPR) equipped with HEPA filters shall be worn during the removal, encapsulation, enclosure, repair and/or other disturbance of friable ACM whenever airborne fiber concentrations inside the work areas are equal to or greater than 0.1 f/cc and less than 2.0 f/cc. A supply of charged replacement batteries, HEPA filters and flow test meter shall be available in the clean room for use with powered air-purifying respirators. HEPA filters shall be changed daily or as flow testing indicates change is necessary. Any type C supplied-air respirator operated in continuous flow may be substituted for a powered air- purifying respirator.

C) Full face piece type C supplied-air respirators operated in pressure demand mode equipped with an auxiliary positive pressure self- contained breathing apparatus shall be worn during gross removal, demolition, renovation and/or other disturbance of ACM whenever airborne fiber concentrations inside the work area are equal to or greater than 10.0 f/cc.

d) Full face piece type C supplied-air respirators operated in pressure demand mode with HEPA filter disconnect protection shall be worn during gross removal, demolition, renovation and/or other disturbance of ACM whenever airborne fiber concentrations inside the work area are equal to or greater than 2.0 f/cc and less than 10.0 f/cc.

e) Use of. single use dust respirators is prohibited for the above respiratory program.

2.0 Personal Protective Equipment

2.1 The Contractor shall provide to all workers, foremen, superintendents and authorized visitors and inspectors, protective disposable clothing consisting of full body coveralls and head covers.

2.2 The Contractor shall provide eye protection (contact lenses shall not be worn and spectacle kits which fit each personal respirator shall be issued), hard hats and safety shoes as required by job conditions and safety regulations. Safety shoes and hard hats shall be approved in accordance with ANSI Z89.1 1969 and ANSI Z41.1 1967.

2.3 Reusable footwear, hard hats and eye protection shall be left in the "Contaminated Equipment Room" until the end of the asbestos abatement work.

2.4 All disposable protective clothing shall be discarded and disposed of as asbestos waste every time the wearer exits the work area to the outside area through the decontamination facilities.

• 2.5 If it is absolutely necessary that non-disposable clothing be worn for the asbestos project, laundering services shall be conducted in accordance with 29 CFR 1926.58.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 31

NYC-WTC 000125609

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125609Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer