NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 321 pages

Asbestos and lead survey report cover, 130 Cedar Street, July

Machine-extracted title · confidence 100%

Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.

NYC-WTC_000125204–000125524

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125301
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos and Lead Paint Inspection Report for 130 Cedar Street, New York, NY 10006 1. The Inspector enters the area to be inspected, • equivalents and creates a hand sketch of the area. identifies all room room which contains the entry door to the Room I is to be the —' dwelling or subsequent room equivalent is then numbered. Room 2 facility. Each the room which is nearest to the left hand Is designated as side of Room I (if facing the dwelling with back towards the dwelling's primary numbering is then continued in a clockwise fashion. entrance). Room

2. The inspector then identifies each testing testing combination is defined as a unique combination in Room I. A equivalent, building component type, and substrate. combination of room and location of the testing combination Is The color, condition also noted. Locations are designated as follows: Wall 1 is the wall directly to inspector when he or she enters the room equivalent. the back of the are numbered in a clockwise fashion. For Subsequent walls example, if the inspector was noting the location of the entry door of a bedroom, that door would be located on 1. If he was noting the location of a window to his left, that wall

window would be located on wall 2. Components and ceilings are noted as located on the ceiling, such as light fixtures not near a wall are noted as located in the and components that are room center. 3. Using the XRF device, the Inspector collects readings from all testing combinations in Room 1. 4. When all testing combinations are tested, the Inspector then continues the Inspection with the remaining room equivalents. 5. The inspection is finished when all testing facility have been tested. combinations in the dwelling or

3.2 SCOPE OF WORK FOR LEAD BASED PAINT:

The inspection for lead based paint included the following locations: 1. Basement 2. Ground Floor 3. Floor 2-12 4. Main and Bulkhead Roofs 5. Terrace Roofs 6. Exterior Facade

The inspection was characterized by a close visual inspection of all accessible areas. Suspect paints were sampled and inventoried for quantity and condition. Components examined included:

• I. Lower Wall

Prepared for Masterworks Development Corp. By JLC Environmental Consultants, Inc. Project No. 04-3271 Page 37

NYC-WTC 000125301

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125301Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →