NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 321 pages

Asbestos and lead survey report cover, 130 Cedar Street, July

Machine-extracted title · confidence 100%

Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.

NYC-WTC_000125204–000125524

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125242
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos and Lead Paint Inspection Report for 130 Cedar Street, New York, NY 10006

1. The Inspector enters the area to be Inspected, Identifies all room equivalents and creates a hand sketch of the area. Room I is to be the room which contains the entry door to the dwelling or facility. Each subsequent room equivalent is then numbered. Room 2 Is designated as the room which is nearest to the left hand side of Room I (if facing the dwelling with back towards the dwelling's primary entrance). Room numbering is then continued in a clockwise fashion.

2. The inspector then identifies each testing combination in Room 1. A testing combination is defined as a unique combination of room equivalent, building component type, and substrate. The color, condition and location of the testing combination is also noted. Locations are designated as follows: Wall u s the wall directly to the back of the Inspector when he or she enters the room equivalent. Subsequent walls are numbered in a clockwise fashion. For example, if the Inspector was noting the location of the entry door of a bedroom, that door would be located on wall 1. If he was noting the location of a window to his left, that window would be located on wall 2. Components such as light fixtures and ceilings are noted as located on the ceiling, and components that are not near a wall are noted as located in the room center.

3. Using the XRF device, the inspector collects readings from all testing combinations In Room 1. •

4. When all testing combinations are tested, the inspector then continues the inspection with the remaining room equivalents.

5. The inspection is finished when all testing combinations in the dwelling or facility have been tested. 3.2 SCOPE OF WORK FOR LEAD BASED PAINT:

The inspection for lead based paint included the following locations:

1. Basement 2. Ground Floor 3. Floor 2-12 4. Main and Bulkhead Roofs 5. Terrace Roofs 6. Exterior Facade

The inspection was characterized by a close visual inspection of all accessible areas. Suspect paints were sampled and inventoried for quantity and condition. Components examined included:

1. Lower Wall ( .j • Prepared for Masterworks Development Corp. By JLC Environmental Consultants, Inc. Project No. 04-3271 Page 37

NYC-WTC 000125242

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125242Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →