NYC 9/11 Public Portal Document
130 Cedar Street July 15, 2004
Selective Demolition and Façade Restoration Koenen Associates
9. Locate selective demolition equipment and remove debris and materials so as not to
impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
11. Return elements of construction and surfaces that are to remain to condition existing
before selective demolition operations began.
B. Existing Facilities: Comply with Construction Manager's requirements for using and protecting
elevators, stairs, walkways, loading docks, building entries, and other building facilities during
selective demolition operations.
C. Removed and Salvaged Items: Comply with the following:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area on-site.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling
during selective demolition.
E. Concrete: Demolish in small sections. Cut concrete to a depth of at least 3/4 inch (19 mm) at
junctures with construction to remain, using power-driven saw. Dislodge concrete from
reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove
remainder of concrete indicated for selective demolition. Neatly trim openings to dimensions
indicated.
F. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain,
using power-driven saw, then remove masonry between saw cuts.
G. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and
remove.
A. General: Promptly repair damage to adjacent construction caused by selective demolition
operations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for
new materials.
1. Completely fill holes and depressions in. existing masonry walls that are to remain with
an approved masonry patching material applied according to manufacturer's written
recommendations.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Promptly dispose of demolished materials. Do not allow demolished materials to
accumulate on-site.
B. Burning: Do not bum demolished materials.
SELECTIVE DEMOLITION 01732-6
NYC-WTC 000125156
OCR can misread numbers and units. Confirm readings against the page image before using them.