NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 105 pages

Air sampling protocol document, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.

NYC-WTC_000125098–000125202

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125100
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Air Sampling and Monitoring Protocol Site: 130 Cedar Street Prepared for Masterworks Development 1.0 Introduction

JLC Environmental Consultants, Inc. (JLC) has been retained by Masterworks Development Corp. to prepare this proposed air-sampling plan for abatement/ deconstruction work at 130 Cedar Street, New York, New York (hereby known as "the subject property"). This plan encompasses several types of monitoring that correspond with the complex nature of the deconstruction process. The demolition includes asbestos and lead based paint removal, roof and exterior façade renovation and interior construction. Source documents used for reference herein are listed in the footnotes and the attached Appendix A. The following is a brief summary of the basic types of sampling work to be completed at the subject property. These definitions were outlined In the Proposed Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project: Level 1: The personnel performing deconstruction work will be responsible to collect personal air samples representative of LC .r 1tl; various work activities. The purpose of this sampling is to determine airborne levels of contaminants generated at the source point. Level 2 iill collect ambient air samples and wipe samples inside the building during deconstruction and abatement of known hazards. Sampling will also be conducted outside the isolation • barriers of the work area and at exits points from contaminated spaces (i.e. the personnel and waste load out decontamination units). Level 3: JLC will monitor the exterior ambient air of the site at street level. — Level 4: JLC will monitor at various points outside of the project boundary. Concurrent comprehensive meteorological monitoring to assist in data analysis will support this sampling.

2.0 Background

This proposed program has been developed to monitor for contaminants of potential concern (CPOC) as referenced by the Initial Building Characterization Study Reps prepared for a neighboring building located at 130 Liberty Street. Meetings and discussions with personnel from the United States Environmental Protection Agency (USEPA) and the New York City Department of Environmental protection (NYCDEP) were also helpful in preparing this document as was the 'Proposed Ambient Air Monitoring Program for the 130 Ubmty Sweet Decons*zucuon Project, prepared by Weston Sohrtiom, Inc., revision 12/1012004

2Intial Building Characterization Study Report, prepared by The Louis Berger Group, Inc., 9/14/2004

NYC-WTC 000125100

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125100Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →