NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
NYC-WTC_000125098–000125202Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Air Sampling and Monitoring Protocol Site: 130 Cedar Street Prepared for Masterworks Development 1.0 Introduction
JLC Environmental Consultants, Inc. (JLC) has been retained by Masterworks Development Corp. to prepare this proposed air-sampling plan for abatement/ deconstruction work at 130 Cedar Street, New York, New York (hereby known as "the subject property"). This plan encompasses several types of monitoring that correspond with the complex nature of the deconstruction process. The demolition includes asbestos and lead based paint removal, roof and exterior façade renovation and interior construction. Source documents used for reference herein are listed in the footnotes and the attached Appendix A. The following is a brief summary of the basic types of sampling work to be completed at the subject property. These definitions were outlined In the Proposed Ambient Air Monitoring Program for the 130 Liberty Street Deconstruction Project: Level 1: The personnel performing deconstruction work will be responsible to collect personal air samples representative of LC .r 1tl; various work activities. The purpose of this sampling is to determine airborne levels of contaminants generated at the source point. Level 2 iill collect ambient air samples and wipe samples inside the building during deconstruction and abatement of known hazards. Sampling will also be conducted outside the isolation • barriers of the work area and at exits points from contaminated spaces (i.e. the personnel and waste load out decontamination units). Level 3: JLC will monitor the exterior ambient air of the site at street level. — Level 4: JLC will monitor at various points outside of the project boundary. Concurrent comprehensive meteorological monitoring to assist in data analysis will support this sampling.
2.0 Background
This proposed program has been developed to monitor for contaminants of potential concern (CPOC) as referenced by the Initial Building Characterization Study Reps prepared for a neighboring building located at 130 Liberty Street. Meetings and discussions with personnel from the United States Environmental Protection Agency (USEPA) and the New York City Department of Environmental protection (NYCDEP) were also helpful in preparing this document as was the 'Proposed Ambient Air Monitoring Program for the 130 Ubmty Sweet Decons*zucuon Project, prepared by Weston Sohrtiom, Inc., revision 12/1012004
2Intial Building Characterization Study Report, prepared by The Louis Berger Group, Inc., 9/14/2004
NYC-WTC 000125100
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
1 shared non-person entities · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164903
Forwarded programmatic agreement documentation addressing post-disaster building cleaning procedures and eligible building list for recovery efforts.
7 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093788
Fax transmittal from the Mayor's Office regarding a March 2002 meeting with the building group.
8 shared non-person entities · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150931
Cover fax from the Mayor's Office forwarding DEP documents regarding exterior clean-up to be reviewed before a meeting with building owners.
7 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
13 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112207
Letter submitting a signed permit application for exterior cleaning at 14 Wall Street to the NYC DEP.
8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
13 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113500
Legal agreement between NYC DEP and the building owner authorizing city-funded removal of foreign material.
8 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.952 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Cited alongside this record in an Ask answer
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Cited alongside this record in an Ask answer
NYC-WTC_000159285
Official letter confirming substantial completion of work under Contract REG-024D subject to outstanding punch list items.
Cited alongside this record in an Ask answer
NYC-WTC_000167029
Draft lease document outlining premises and terms for the Mayor's Office of Emergency Management at 7 World Trade Center.
Cited alongside this record in an Ask answer
Lease provision defining the landlord's ownership warranty and requirements for final layout and finish plans at 7 World Trade Center.
Cited alongside this record in an Ask answer