NYC-WTC_000121258
Air monitoring report for 345 South End Avenue buildings conducted in January 2002 showing TEM results.
13 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗Cover page for a fax transmission dated September 28, 2001, containing confidential environmental data.
NYC-WTC_000117772–000117793Folder label: “345 SOUTH END AVENUE Block: 16 Lot: 100 BIN: 1083378 365 South End Avenue, Building #300”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Oct 05 O1 11:17a RLC Environmental (212)279-5747 p.3
V 104 East 25th Sirsel V New York. New York 1.070 www.atC-¢rn3rO.COm 212.353 8260 Pax 212.353.8306 ASSOCIATES INC.
~ a October 4, 2007, ALC nnvironmantal ".3 W. 30th street ::3RD Y:`r.k, NY :~ ~►L'`J1 Attn: Mr. Joshua Saret.+.° Re: Report of TRM Analysis Dear Mr. Sarett: Following are the results of transmission electron microscopy (TEM) analysis of air samples from our Group No. S601. Client: Gateway Plaza Mall Project Name: 355 South End Av,*nue Location: Various Apartments Samples received: 10/04/01 These results will confirm and document the data transmitted today to you. The analyses were performed in strict conformance with the methodology of the AHERA Final Rule (CFR October 30, 1987) for clearance of abatement sites. As indicated on the attached Summary Results sheet, less than 70 asbestos structures per mw was detected in all of the twelve final samples submitted from the site. Results reported as Struct/cc are a function of air volume collected in the field and are, as such, not verifiable by this laboratory. This report may be reproduced only in its entirety and not without prior permission of this laboratory. If the post- abatement inside samples pass, the response action may be considered to have been completed. The analyses were supervised by Dr. Michael A. Gorycki, Director of Electron Microscopy. We are pleased to note that our TEM lab has received fu3 acered~ion from NVLAP, as is currently required for recognized analysis of 'TEM air sample's for AHERA projects, and also approval under the NY State 0414 ELAP program. These analyses were performed by ATC d/b/a ATC Associates Inc. Please contact me regarding any questions relating to these materials. Very truly yours,
chael A. Gorycki, 11.0. Director of Electron Microscopy
NYC-WTC 000117789
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000121258
Air monitoring report for 345 South End Avenue buildings conducted in January 2002 showing TEM results.
13 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121287
Air monitoring report for 345 South End Avenue buildings conducted in January 2002 showing TEM results.
11 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121138
Air monitoring report for 345 South End Avenue buildings conducted in December 2001 showing TEM results.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121516
Document tracking environmental samples collected from Building #600 at 395 South End Avenue on January 2, 2002.
23 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121076
Air monitoring report for 345 South End Avenue buildings conducted in March 2002 showing TEM results.
12 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000124246
Laboratory results for confirmatory asbestos bulk sampling conducted on the roofs of 99 Church Street in May 2002.
15 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121364
Chain of custody for air samples collected at 345 South End Avenue buildings in late January and early February 2002.
12 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112249
Invoice for roof cleanup services involving asphalt and gravel removal totaling over $24,000 at 26 Wall Street.
10 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118332
Invoice dated July 31, 2002 detailing costs for asphalt and gravel roof cleanup at 60 Broad Street.
8 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121332
Air monitoring report for 345 South End Avenue buildings conducted in January 2002 showing TEM results.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127341
Invoice from Fiber Control, Inc. dated July 2, 2002, billing the DEP for work at job sites including 119 Chambers Street.
9 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126288
Invoice dated July 18, 2002, from Fiber Control Inc to the New York City Department of Environmental Protection for facade and other cleanup services.
6 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000155118
Correspondence regarding a joint meeting with building owners to discuss cleanup timelines, funding options, and EPA clearance requirements.
Cited alongside this record in an Ask answer
NYC-WTC_000168020
Detailed furniture specifications and pricing for the Mayor's Office of Emergency Management workspace on Floor 23 of 7 World Trade Center.
Cited alongside this record in an Ask answer
NYC-WTC_000095634
Memo dated January 10, 2005 regarding a SEQR Lead Agency request for the BMCC Decontamination project.
Cited alongside this record in an Ask answer
NYC-WTC_000141648
Memorandum instructing staff to submit monthly force account equipment usage reports for FEMA reimbursement.
Cited alongside this record in an Ask answer
NYC-WTC_000145345
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer