Asbestos inspection report, 106 Liberty Street, May 2002

Machine-extracted title · confidence 95%

Asbestos inspection report for 106 Liberty Street conducted in May 2002.

NYC-WTC_000116595–000116597

Folder label: “35 Ann Street 104-108 Nassau St. BN# 1001273

Page image
Scanned page image, NYC-WTC_000116596
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE 1 OF PREMISE /~~" & W/05/02 ADDRESS 106 Liberty Steet (AKA) 111 Cedar Street ~' FLOOR' ZIP BORO CODE BLOCK LOT O &Facade 10006 ! SQUAD I BADGES A078

INSPECTOR R. BLDG.. TYPE B BASIS OF INSPECTION TRU1204MN02 PHOTOS TAKEN YES NAM SAMPLE NO.----------------------- no ACU)RS OSKemoval Corp. IZ)NT IT!Yds 120t1 Street CollegePoint SAMPLE NO.

4FE 113 6 (7T13 N46l-4100 SAMPLE NO. ---------___.________________________________

OWNEB.NM warrenXc 'anzer Engineers, P.C. i i i ueaar Street Co. C/O Sylven Lawrence l ast 45`" Street New Yo ck IkSWiiiiam Street NewYork RYE ZIP 4iE 106Y 7 (21M22-0077 (fi{gr344-0044 CONTACT PERSON Joe Bonder TIME OF INSPECTION FROM: 8 am — 8 pm

INSPECTION DISCLOSED: 8/03/02: Saturday: Handler Supervisor Sasa Simic and 6 handlers and the Air-sampling Technician John Boyd came on site. Crew set-up dykes on cedar street, Trinity Place and Liberty street. Crew of four staretd on the roof cleaning A/C units & Donnage. At the end of the day crew completed the roof . Air monitoring was performed throught the clean-up.

8/04/02: Sunday: Handler Supervisor Sasa Simic and seven Handlers started to set-up dykes on Trinity Place, Cedar Street and Liberty Street sidewalks for facades cleaning. The boom truck was moved to Liberty Street and facade cleaning started after setting-up dykes with plastic on the scaffolding bridge. A second crew comprising Supervisor Jan Wolkowicz and six handlers started cleaning the facade under the bridge. The Air monitoring was performed by Ellis of Warren & Panzer. The facade on Liberty Street was completed. Sasa and crew started cleaning the facade of Cedar Street using the boom truck. Cleaning complete at 2:00 pm visual inspection was satisfactory. The boom truck was moved to 113-117 Cedar Street to clean the three rows of windows from west side, that was over sprayed by the crew at 114 Cedar Street. Crew also cleaned the Granite facade face of 113-117 Cedar Street. All cleaning completed and the crew left the site after cleaning all three sidewalks.

NOV 11 INFRACTIONS RESULT CODE 5 NOV a SUPERVISORS INITIALS

- 1nt..i, nn A hill S. - U[lV1l2S J - U1lV VllI. * LI .P V JL SI l , ..

BLDG. TYPE A >6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1= Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

NYC-WTC 000116596

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000116596Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →