NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 46/35 Ann Street 104-108 Nassau St. BN# 1001273
Document / 10 pages

Invoice for roof cleanup, 106 Liberty Street, Aug 2002

Machine-extracted title · confidence 95%

Invoice from Asbestos Removal Corp for roof cleanup services performed at 106 Liberty Street in August 2002.

NYC-WTC_000116627–000116636

Folder label: “35 Ann Street 104-108 Nassau St. BN# 1001273

Page image
Scanned page image, NYC-WTC_000116631
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ASBESTOS INSPECTION REPORT PAGE I OF PREMISE ADDRESS T 106 Liberty Steet (AKA) Ill Cedar Street N /05/02 ZIP UORO CODE BLOCK LOT k DO Facade 10006 1 SQUAD 1 BADGER A078

INSPECTORR. RAMMOHAN BLDG.. TYPE B BASIS OF INSPEcnON TRU 1204MN02 PHOTOS TAKEN YES [ N AM SAMPLE NO.----------------------- trio ACSDestos kemoval Corp.

120'° Street CollegePoint SAMPLE No.------------------------

SAMPLE NO...................---------_._..____.___._.. --------------------------------------------------- W' I I3''5 (71 61-4100. warren &c anzer Engineers, P.C. i i iEC~e~arStreet Co. C/O Sylven Lawrence 2 ` ast 45i1i Street New YSrk IN"William Street NewYork 4E WE ZIP 10617 (2T 22-0077 ('t121F344-0044 CONTACT PERSON Joe Bonder TIME. OF INSPECTION FROM: 8 am — 8 pm

INSPECTION DISCLOSED: 8/03/02: Saturday: Handler Supervisor Sasa Simic and 6 handlers and the Air-sampling Technician John Boyd came on site. Crew set-up dykes on cedar street, Trinity Place and Liberty street. Crew of four staretd on the roof cleaning A/C units & Donnage. At the end of the day crew completed the roof. Air monitoring was performed throught the clean-up:

8/04/02: Sunday: Handler Supervisor Sasa Simic and seven Handlers started to set-up dykes on Trinity Place, Cedar Street and Liberty Street sidewalks for facades cleaning. The boom truck was moved to Liberty Street and facade cleaning started after setting-up dykes with plastic on the scaffolding bridge. A second crew comprising Supervisor Jan Wolkowicz and six handlers started cleaning the facade under the bridge. The Air monitoring was performed by Ellis of Warren & Panzer. The facade on Liberty Street was completed. Sasa and crew started cleaning the facade of Cedar Street using the boom truck. Cleaning complete at 2:00 pm visual inspection was satisfactory. The boom truck was moved to 1 13-1 17 Cedar Street to clean the three rows of windows from west side, that was over sprayed by the crew at 114 Cedar Street. Crew also cleaned the Granite facade face of 113-117 Cedar Street. All cleaning completed and the crew left the site after cleaning all three sidewalks. I

NOV 11 INFRACTIONS RESULT CODE 5 NOV d SUPERVISORS INITIALS

DVRV ■ - IRHIl.a\ ■ 1 t111 L - ulwnA J - uLwvllU. n + - V -1 ° ' '-''

BLDG. TYPE A >6 STORIES B< 6 STORIES C SINGLE FAMILY D SCHOOL E HOSPITAL F PUBLIC OWNED PROPERTY RESULT CODES 1 = Violation Issued 2 = No Violation Issued 3 = No access 4 = Project not Started (no NOV) 5 = Public Owned Property ACP3093

NYC-WTC 000116631

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000116631Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →