NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 45/213 PEARL STREET 1001119, 69/5
Document / 2 pages

Asbestos inspection log, 213 Pearl Street, Sept 2002

Machine-extracted title · confidence 93%

Inspection log documenting roof and facade cleanup activities at 213 Pearl Street with air sampling conducted by certified staff.

NYC-WTC_000115243–000115244

Folder label: “213 PEARL STREET 1001119, 69/5

Page image
Scanned page image, NYC-WTC_000115243
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. 213 PEARL STREET Inspection Date: As NOTED Floor Zip Borough Block Lot Squad # Badge # ROOF$ FACADE 10038 1 69 5 N/A A020 Inspector Building Type Basis of Inspection Photos Taken Dennis Antzoulatos MIXED USE WTC Survey Yes/ No Contractor's Name Sample Number Benjamin Kurzban & Son Control N/A Address City Sample Number 1248 Ralph Avenue, Brooklyn N/A Phone Sample Number 11236 (718)531-2900 N/A Laboratory Name Owner's Name Warren & Panzer Engineers Inc. Address 228 East 45 Street City Address New York City State NY Zip Phone State Zip Phone 10017 (212) 922-0077 Contact Person Time of Inspection from: As NOTED THURSDAY SEPTEMBER I2 2002 THE CLEAN UP QF THE ROOF WORK AREA WAS CONDUCTED TODAL. POOF CLEAN UP OF THE ADJACENT BUNDING, 215 PEARL SIRGETI WAS PERFORMED SIMULTANEOUSLU. FOR AIR MONITORING PURPOSES THE ROOF AREAS OF THESE TWO BULLDINGS WERE TOEATED AS OLE WORK AREA. A REMOTE DECON UNIT WAS ERECTED ON THE FOOF OF 205 PEARL STREET. AIR. SAMPUNG FOE THIS PORTION OF THE CUEHN UP LOAS PERFORMED BY JOHN BOYD (CERTIFICATE * " ERP 01l03). FRIDAY SEPIEMBER 13 2002 THE CIEAN UP OF THE WEST CREAR) FACADE WAS CONDUCTED TODAY. THE CUEAN UP OF THE WEST FACADES OF ZIS AND 211 PEARL STREET WERE PERFORMED SINULTANEDUSLY. FOR AIR SAMPUNG PURPOSES THE WEST FACADES OF THESE THRRE BULLDINGS WERE TREATED AS ONE WORK AREA ALR SAMPUNG WAS PERCORMED B4 JOHN BBOYD. THE SET BACK WORK AREA CUEAN UPS OF THESE PREMISES BEGAN TODAY. SATURDAY SEPTEMBER 14 2002 THE CUEAN UR OF THE SET BACK AREA IS COMPLETED. AlR SAMPLING USAS PERFORMED BY JOUN BOYD. THE CIEAN UP OF THE EAST FACADE DE THE PREMISE MAS ALSO PERFORUED TODAR. THE EAST FACADE CLEAN USP DF THE ADHCENT BOLLDINGS {211 AND 215 PEARL ST) WEDE CONDUCTED SIMULTANE- OUSLL, FOR AIR SAMPUNG PURPOSES THE EAST FACADE OF THESE TUREE BUILDINGS WERE TREATER AS ONE WORK AREA. ALR SAMPLNTA FOR THLS PORTION GF THE CUEAN UP WAS PERFORME BY OCHOGHO ERHABOR A DECON TROCK WAS UTUZED ICERTIFICATE # AM00-16195 EXP RIOZD TEOR ZII AND 2I3 PEARL ST ONLY AND A PLASTIC DYKE WAS CONSTRUCTED NYC-WTC_000115243

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000115243Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →