NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/130 WILLIAM STREET; 1001187, 77/15
Document / 2 pages

130 WILLIAM STREET; 1001187, 77/15

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000110520–000110521
Page image
Scanned page image, NYC-WTC_000110520
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document '. Asbestos Inspection Report Premise No. DOR, FACADE 2о, 6ти, 8ты, мтн Zip 10038 Inspector Dennis Antzoulatos 130 WIWAM STREET Borough Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address Azdrcsalph Avenuc, Brookiyn State NY Phone 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block Lot 15 Inspection Date s NOTET Squad # N/A TBadge # A020 Photos Taken Yes/ No Sample Number N/A Sample Number N/A® Owner's Name • Address City State Zip Phone Time of Inspection from: As NoTED THURSDAY OCTOBER 24 2002 THE MANGING SOAFFOLD 1S ERECTED ON THE EAST FACADE OF THE PREMISE. FRIDAY OCTOBER 25 2002 THE CUEAN UP OF THE EASI FACADE OF THE PREMISE WAS PERPORMED. Me SAMPUNG WAS PEREORMED BY FESTY OSEMWEGIE (CERTIFICATE # AH O1-O1030 AT THE COMPLETION OF THE CUEAN UP ACTIVITIES I CONDUCTED A VISUAL INSPECTION OF THE CLEANED FACADE SURFACES AND I OBSERNED NO VISIBLE WITC DEBRIS. MONDAY OCTOBER 28 2002 ThE cuEAN Up Df THE SMAU (TCP) ROCF WCRK AREAS WAS PERFOKMED. AIR - SAMDUNG IDO TUIS PRRTIDN AF TUF CUEANI UP WAS PERFORMED BY YURI BEDIN PII AIR SAMPUNG EQUIPmENT wAS SET uP ON The MAIN ROOF. MOVING SCAFPOLD MOVED FROM THE EAST FACADE TO THE NORTH FACADE IN PREPARATION FOR THE NOCTH FACADE CIEAN UP. TUESDAY OCTOBER 29 2002 THE CUEAN UP DF THE MAIN CLARGE) ROOF AREA WAS CONDUCTED. AIR SAMPUNG WAS PERFORMED BY YURI BEDIN DE WARREN & PANZER. THE CUEAN UP DF THE NORTH FACADE BEGAN. THE CUEAN UP OF THE EAST AND NORTH FACADE INVOLUES THE HEDA VACUUMING AND WET WIPING OF WINDOW SUCFACES AND LEDCES. WEDNESDAY OCTOBER 30 2002 THE CUEAN UP OF THE NARTH FACADE CONTINUES. THE CUEAN UP OF THE SECOND FLOOK SET BACK BEGINS. AIR SAMPUNG IS PERFURMED BY WARREN AND PANZER ENGINEEES. NYC-WTC_000110520

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000110520Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →