NYC-WTC_000100673
Report documenting asbestos inspection and cleanup activities conducted by ETS Construction at 114 Liberty Street.
7 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗Header page of an asbestos inspection report for 114 Liberty Street dated March 25, 2003.
NYC-WTC_000102715–000102731Folder label: “INSPECTION REPORTS”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
items were discussed. Resident decided to dispose the wood planters. Additional discussions ensued regarding the cleaning of the wall spaces behind the kitchen wall and splash guard. The anranaement of this apartment is different from the others and the wall would not be taken down from either direction. Architect agreed to have the splashguard removed prior to our cleaning activities. A listing of items was not provided.
The walk-through of the 9th floor again disclosed that most personal belongings were not within the apartment. Resident had some questions regarding the staging area and was concerned that components of built In cabinents would be consolidated and then would be difficult to restore. It was suggested that a floor plan be used, the rooms numbered and a small number be placed at the bottom of drawers and shelving prior to our cleaning activities. The recessed lighting in this apartment would most likely not be reusable since it is attached to the ceiling sheet rock that is being removed and discarded. The issue of the cabinetry hardware was again discussed. An air purifying unit that was covered in thick dust and the resident agreed to its disposal. The library room paneling was to be removed prior to cleaning activities so that the library could later be restored. Most components of the fireplace would be removed from place due to the removal of the sheet rock. A listina od items was not provided.
The removal of waste and placement of the waste decon were discussed. The service elevator is smaller than the passenaer elevator and is not reachable directly from the apartments. ETS and the construction manager (Donovan) discussed plans to remove the lobby stone in one area so that entry Into the restaurant was possible from the lobby.
NYC-WTC 000102726
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000100673
Report documenting asbestos inspection and cleanup activities conducted by ETS Construction at 114 Liberty Street.
7 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
10 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118190
DEP inspection form for 50 Broadway documenting building characteristics, facade conditions, and asbestos-containing material survey across multiple building faces.
3 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
4 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
5 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115228
Invoice from Benjamin Kurzban & Son to the DEP for work completed at 213 Pearl Street on September 24, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127588
Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
3 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100648
Final notice regarding WTC debris found on exterior surfaces and invitation to participate in City cleanup program.
3 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112486
Form recording facade inspection results and asbestos monitoring status for a commercial building at 45 Wall Street.
4 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119704
Invoice from Benjamin Kurzban & Son Control Inc. for asbestos removal work completed at 57 Ann Street in November 2002.
4 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112085
Header page identifying records related to environmental work at 20 Vesey Street.
4 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000100673
Report documenting asbestos inspection and cleanup activities conducted by ETS Construction at 114 Liberty Street.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155907
Facsimile cover sheet from legal counsel transmitting correspondence to EPA Region 2 regarding 125 Cedar.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155912
Facsimile cover sheet from legal counsel transmitting correspondence to EPA Region 2 regarding 125 Cedar.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155896
Legal firm transmits documents regarding 125 Cedar Street to the EPA via fax on June 20, 2002.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102668
Project update on resident notifications and contractor equipment mobilization for decontamination systems.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155223
Notice requiring 114 Liberty residents to submit preservation lists before cleanup mobilization.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000102699
Fragmented text from a Department of Environmental Protection inspection report file within Box 35.
Filed in the same folder
NYC-WTC_000102700
Asbestos visual survey form with redacted fields regarding building conditions and inspections.
Filed in the same folder
NYC-WTC_000102705
Header page of an asbestos inspection report form from the NYC Department of Environmental Protection.
Filed in the same folder
Header page of a DEP Asbestos Inspection Report submitted by ETS Construction for the 114 Liberty Street site.
Filed in the same folder
NYC-WTC_000102712
Fragmented page from a visual inspection report for 114 Liberty Street dated March 2003.
Filed in the same folder