NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 35/21 MAIDEN LANE 1001096, 65/6
Document / 6 pages

Asbestos abatement invoice, 21-23 Maiden Lane roof project, July 2002

Machine-extracted title · confidence 95%

Invoice from Kurzban & Son for asbestos removal work completed at 21-23 Maiden Lane in July 2002 covering 7,143 square feet.

NYC-WTC_000102099–000102104

Folder label: “21 MAIDEN LANE 1001096, 65/6

Page image
Scanned page image, NYC-WTC_000102104
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • Asbestos Inspection Report Premise No. Floor 21 MAIDEN LANE Borough POOF & SETBACK Zip 10038 Inspector Dennis Antzoulatos Building Type MIXED USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block Inspection Date: As NOTED Squad # Badge # Basis of Inspection N/A A020 Photos Taken WTC Survey Yes(No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NOTED FRIDAY OCTOBER 18 2002 (0800 AM- OBOOPM) THE CUEAAS UP OF THE ROOF OF THE PREMISE WAS CONDUCTED. AlR SAMPUNG FoR THIS FORTION OF THE CUEAN UF UNS PERFORMED B4 PURI BEDIN (CERTFICATE # AH 96-14941 ERP 02/03). AIR SAMPUNG EQUIPMENT WNS 'JRT: UP ON A CEAu POFTION OF THE ROOF. SATURDAL OCTODER 19 2002 (0900AM-0330PM)- SUNDAY OCTOBER 20 2002 THE CUEAN UP OF THE DETBACK AREA IN BACK DF THE "SUBWAY' SANEWICH SHOP UAS BEGUN. AIR SAMPLNE FOR THE PORTION OF THE CLEAN UP PRAECT IIAS PERFORMED 84 CELESTINE NMORKA (CERTIFICATE E* AL- 0208495 0RP 04/03). DUE TO SPACE UMITATIONS NO DECON UNIT UnS ERECTED STET OFF PADS AND THE WEARINE OF DOUBLE PROTECTIVE JUITS 5 EMPLOYED. ASBESTOS HANDLER SUPEPUISOR IS ASKED TO INSTRIKT THE ASPESTOS HANDUER TO VACUUM AOCUMULATONS OF WATER I THE wORK ARFA AND TO ENSURE THAT NO -STANDING WAER IS GEFT IN THE WORK AREX OF THE SHIFT. _MONDAY OOFER 21 2002 IDRIS IDOWY ICERTIFICATE M AH 02-11201 EXP OS/03) OF WARDEN È PANZER CONDUCTS A VISUAL INSPECTION OF THE CUEANED WORK ARKAS AND PESERUES NO VISIBUE WTE DEBRIS. TUESDAY OCTOBER 72 zouz I CONDUCTED A VISUAR INSPECTION OF THE CUEANES WORK AREAS. I OBSERNED VSIBLE LUTE DEBRIS ON THE ROOF AND THE SETBACK ADEA. A RECUEANING OF THESE AREA IS ORDEREDI AT THE COMPLETION OF THE DE CHEWING ACTIVITIES, " CONDUCTED À VEUA NSPECTION AND I OBSERVED NO NISIBUE UUTE DEBRIS. THE CUEAA UP 1E NOLS COMPLOTE NYC-WTC_000102104 :

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000102104Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →