NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 39/161/167 William Street; BN# 1001269 / 1001268
Document / 3 pages

Asbestos inspection form, WTC site, Oct 2001

Machine-extracted title · confidence 92%

Inspection form documenting an asbestos survey of exterior areas at a World Trade Center vicinity site.

NYC-WTC_000110886–000110888

Folder label: “161/167 William Street; BN# 1001269 / 1001268

Page image
Scanned page image, NYC-WTC_000110887
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report Premise No. Floor ecof, 21,1B,15,12 Zip 10038 Inspoctor Dennis Antzoulatos 161 WILLIAM STREET Borough 1 Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address 228 East 45 Street State NY Zip 10017 New York Phone (212) 922-0077 Contact Person Inspection Date: As NOTED Block 92 Bei o iapacton Squad # N/A Badge # A020 Photos Taken WTCSurvey Test No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Time of Inspection from: AS NOTED Phone TUESDAY OCTOBER B 2002 (800AM-630PM) THE CUEAN UP OF THE HIGH ROOF (BLACK GRAUEL) BEGAN TODAL. A PEMOTE DECON UNIT WUAS ERECTED ON THE 2IST FUDOR (VACANT). AIR SAMPUNG WAS PEEFORMET BU tUEI BEDIN / CERTIFICATE # AH X6-14947) OF WARREN I PANZER, AIR SAMPUNG EQUIPMENT WAS SET UP ON THE LOW RODF (Z2NO FLGOR). WEDNESDAL OGTOBER S 2002 (800AM-630PM) THE CUEAN UP OF THE LOW ROOF BEGAL TOPAY. AlR SAMPLNG IS PERFORMED B4 YURI BEDIN COERTIFICATE # AH 96-14947). THURSDAY OCTOBER 10 2002 (B00AM- 630PM) THE CHEAN UP OF THE ROOF WORK AREAS WAS COMPUETED. THE CLEAN UP OF THE I8TA FLOOR SETBACK BEGAN TODAY. ALe SAMPLNGA PERFORMET By YUEI BEDINL. ERIDAL OCTOBER |I 2002 TO SATURDAN OCTOBER I2 2002 (B00AM-63MPM) THE CUEAN UP DF THE IBTH FLOOR SET BACK IS COMPLETED. AIR SAMPUNG FOR THIS PORTION OF THE CUEAN UP WAS PERFORMED B4 YURI BEDIN. MONDAR OGOBER 14 2002 (B0AM-100PM) THE CUEAN UP OF THE 15TH FLOOR AND I2TH FLOCR SETBACKS WAS PERFORMED TODAY. ALe SAMPLING FOR THE ISTH FIDCR SET BACK WAS PERFORMED BY JON BOrO ( CERTIFICATE # AH90-05530 EXP01l03). Ale SAMPUNG FOR THE 12TH FLOOR SETBACH WAS PETPORMED Er MOHAMMED WORDEK (CERTIFICATE # AH 93-08449 EXP 01/03). I CONDUCTED A VISUAL INSPECTION OF ALL THE CLEANED WORK AREAS AND OBSERUED NO VISIRUE WUTC DEBRIS. THE CLEAN UP PROSECT AT THE PREMDE IS NOLO COMPLETE. PPP NYC-WTC_000110887

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000110887Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.970

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →