NYC-WTC_000115082
Permit application submitted by Benjamin Kurzban & Son Inc. to the DEP for roof work at 205 Pearl Street.
9 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗Invoice from Kurzban & Son for asbestos removal work completed at 21-23 Maiden Lane in July 2002 covering 7,143 square feet.
NYC-WTC_000102099–000102104Folder label: “21 MAIDEN LANE 1001096, 65/6”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
.4 NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION a, div ora Asbestos Control Program aS~ 59-17 Junction Boulevard, 8°i Floor, Corona, NY 11368-5107 f~ FOR USE ONLY 7TE•N o~ ASBESTOS PROJECT NOTIFICATION ORMS WILL BE ACCEPTED "`"rAL. . Mww. c: y%ciao::• (ASBESTOS INSPECTION REPORT) 1.')4. e: (Se When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week In advance of the start of abatement activities.
1. FACILITY
2. Address 2.1 23 M Al DEN LANE Borough MAtit Zip : 1.0038
AKA 3. Block 4. Lot
5. Type of Facility 6. Name of Building 11. BUILDING OWNER
7. Name 8. Contact Person
9. Tel.# Fax#
10. Address City State _ Zip
111. GENERAL CONTRACTOR
11. Name Tel. #
IV. ASBESTOS ABATEMENT CONTRACTOR
12. Name iEl& M1N 2(3AN u 4 Som Cs wTQot, INC 13. Contact Person Lou E. tANNico 14. Federal Employer ID. # L._._,_._,_._PIL.~_._ _. __ 15. Tel. #. (1 ') 53t - 29t70 Fax # t tt S) 209- t $OS _
16. Address 124 6 •ô4_p JENU City BV—c~- -4 PI State _Y Zip it 23G
V. THIRD PARTY AIR MONITOR
17. Name _U-) AI N ~t swe I .pt G t a 18. Contact Person _M t C.FlAEL NOLAN 19. Federal Employer ID. #i P! ^ 20. Tel. # (212)922- OOT T Fax # C2 t2) 92? -0630
21. Address _ 2 2 3 EAST 415nt S-r-rzc-~-r City _W taR4e. State N Zip (0D C(
22. Sample Analysis Laboratory 23. NYS DOH ELAP #
VI. PROJECT INFORMATION 24_ Starting date for this portion of work 101(8 o -L t 1 to 2 Projected completion date tt 15
Asbestos work schedule ® Monday ® Tuesday ® Wednesday ® Thursday I Friday Sunday
Shift from: 150 IN am 0 pm to e ° ❑ am ® pm
If other, , specify
Access to inspect the premises must be provided during the work schedule indicated in this item. OCT ii 200,2 25. Total amount of asbestos-containing material to be abated during this work
Square Feet, and/or Linear Feet ~ t ), ACP 7 / 2/2001 Ot . a1:1a~~ ~petlaW. in?
NYC-WTC 000102100
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000115082
Permit application submitted by Benjamin Kurzban & Son Inc. to the DEP for roof work at 205 Pearl Street.
9 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115835
Invoice from a contractor for remediation work performed at 45 Park Place in November 2002.
5 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000110630
Permit or correspondence document related to environmental work at building 150, including submission to DEP Corona office.
9 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100474
Billing statement from a contractor detailing charges for environmental cleanup and facade work.
7 shared non-person entities · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121883
Invoice from Fiber Control Inc. dated September 25, 2002, regarding work at the 116 Chambers Street site.
6 shared non-person entities · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
7 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128117
Invoice from Kurzban & Son documenting $3,240 for 1620 SF of asbestos work at 44 Gold Street completed in October 2002.
9 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115228
Invoice from Benjamin Kurzban & Son to the DEP for work completed at 213 Pearl Street on September 24, 2002.
9 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122562
Invoice from Fiber Control, Inc. for asbestos roof cleanup services at 173 Broadway and other locations in June 2002.
6 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
10 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000102091
Page header identifying a document record for 21 Maiden Lane within the DEP Box 35 collection.
Filed in the same folder
NYC-WTC_000102092
September 2002 final notice from DEP to building owners regarding World Trade Center debris cleanup at 21 Maiden Lane.
Filed in the same folder
NYC-WTC_000102105
Page header identifying a document record for 21 Maiden Lane within the DEP Box 35 collection.
Filed in the same folder
NYC-WTC_000102107
September 2002 final notice from DEP to building owners regarding World Trade Center debris cleanup at 21 Maiden Lane.
Filed in the same folder
NYC-WTC_000102121
Form documenting facade inspections and air monitoring results for World Trade Center debris at 21 Maiden Lane.
Filed in the same folder