NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 34/87 NASSAU STREET 1001211, 79/1 BN# 1001211
Document / 2 pages

Asbestos inspection log, 87 Nassau Street roof and facade cleanup,

Machine-extracted title · confidence 94%

Inspection log detailing scaffold erection and WTC debris removal from the penthouse roof and south facade of 87 Nassau Street in September 2002.

NYC-WTC_000099397–000099398

Folder label: “87 NASSAU STREET 1001211, 79/1 BN# 1001211

Page image
Scanned page image, NYC-WTC_000099397
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document 1.*..vat.ka Asbestos Inspection Report Premise No. 8T NASSAU STREET Floor Zip Borough ROOF É FACADE 10038 Inspector Building Type Dennis Antzoulatos COMMEECIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State NY Zip Phone 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 19 Inspection Date: AS NOTED Squad # TBadge# N/A A020 Basis of Inspection Photos Taken WTC Survey Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NOTED THURSDAY SEPTEMBER 1$ 2002 FRIDAY SEPTEMBER 1S 2002 THE HANGING SCAFFOLDING IS ERECTED IN PREPARATION FOR THE CUEAN UP OF THE SOUTH FACADE OF THE PREMISE: SATURDAY SEPTEMBER 1 2002 - MONDAY SEPTEMBER I6 2002 NO WORK WAS PERFOKMED TUESDAY SEPTEMBER Il 2002 (800AM -800PM) THE CUEAN UP CF THE PENTHOUSE ROF OF THE PREMISE BEGAN TODAY. A REMOTE DECONTAMINATION UNIT WAS ERECTED ON THE SECOND RLOOR OF THE AIR SAMPUNG FOR THIS PORTTON OF THE CUEAN UP WAS PERFORMED By DIPO ELEMO CCERTIFICATE # AH 01-14694 EXP 03/03). AiR SAMPLES WERE PUN ON THE MAIN ROOF Of THE PREMISE. WEDNESDAY SEPTEMBER 18 2002 (800 AM-B0OFM) PENT MOUSE CO0E CLEAN UP CAS COMPLETED TODAY. THE CUEAN UP CE THE MAiN ROOF AND THE CLEAN UP DF THE SOUTH FACADE BEGAN TODAY. ALR SAMPLING FOR THE MAIN DOCF CIEAN UP WAS PERFORMED BY DIPO ELEMO. AlR SAMPUNG FOR THE SOUTH FACADE CiCAN UP WAS PERFORMED B4 YURI BEDIN (CERTIFICATE # AM 96- 149AT EXF 02/03) THURSDAY SEPTEMBER 19 2002 (800AM- 800PM) CLEAN UP OF THE MAIN BOOF IS ONGOING. dEAN Up Of The SouTH FACADE IS COMPLETED. AIR SAMPUNG FOR THIS PORTON dE THE cuEAN NYC-WTC_000099397

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000099397Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.970

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →