~e January 16, 2003
1675 ~M
r
7- 'i/' Ms. Annette Asbill
ivewio ' FEMA
Department of 80 Centre Street, 3rd Floor
Environmental New York, New York 10013
Protection
59-17 Junction Boulevard
Dear Ms. Asbill:
Flushing, New York
11373-5108 This is a follow-up to our previous communications regarding 93 Nassau Street,
also known as 139 Fulton Street, Manhattan. This building is eleven stories with
an extension to twelve stories on one side and extends the length of Nassau Street
Christopher 0. Ward from Fulton Street to Ann Street. It occupies approximately 120 by 100 ft and is
Commissioner a registered landmark. The New York City Department of Environmental
Protection exterior survey disclosed the presence of visible debris from the
collapse of the WTC on the exterior surfaces. We have met with the building
Robert C. Avaltroni owner and his consultant on numerous occasions in order to address the removal
Deputy Commissioner of the debris.
Bureau of As discussed in ourprevious correspondences, the activities q
Environmental required for proper
Compliance cleaning of the exterior structure are beyond the scope of work developed for the
exterior-surface cleaning program. The cleaning activities would impact the
Tel (718) 595-4418
Fax (718) 595-4422 current building systems. The building is constructed of brick and has a cast iron
facade with galvanized sheet metal ornamentation. It has approximately 400
painted wood frame windows that are damaged, cracked and do not seal properly
when closed. The facades appear to require restoration and the paint condition is
peeling and flaking. Water tables protrude from the windows making sealing and
containment around hanging scaffolding infeasible.
The scope of work developed for the cleaning of the exterior facades and roofs
requires the HEPA-vacuuming and low-pressure washing to remove visible debris
from collapse of the WTC. HEPA-vacuuming and low-pressure washing would
remove sections of the current paint system that are deteriorated. Inadequate seals
around windows require steps to prevent entry of materials and water to the
building's interior. Further, the architecture of the building limits scaffolding
options as evidenced by the previous damage to the water tables and
ornamentation during previous work in which hanging scaffolding was used.
Samples were collected from exterior surfaces to determine whether the debris
from the collapse of the WTC was asbestos-containing material (ACM). The
samples disclosed three of the 28 samples were ACM. Therefore, in accordance
with the asbestos rules, the debris must be treated as ACM. A copy of the sample
results is attached.
f
q~
P,K C1T1'DEP
A containment system to prevent the spread of WTC debris and lead-based paint
~ from the facades would require the installation of a sidewalk shed and a full pipe
r( I~ P } scaffolding system. A summary of observations and concerns had been prepared
and forwarded to your office in our previous correspondence. A copy is attached
Q°"MENrALPa°tE~ for your reference. Photographs have also been taken and are attached.
~ www.0yc.gav/dep
, .u+ OEP-HELF
NYC-WTC 000099164